ZukoBid.
Try it free
Federal contractor profile

Don Jones Construction Co., INC.

Columbus, GA · Not a small business · Part of Don Jones Construction Co. INC.
UEI ZUFKNCHD8FA9 · CAGE 1UYN1
Contracts won
24
since Jun 2024 · last Jun 2026
Total value
$25M
including options
Buying offices
1
government offices it sold to
Usual competition
—

Wins by fiscal year

FY2024
10 · $12M
FY2025
10 · $8.9M
FY2026
4 · $3.6M

Who it sells to

W6qm Micc-Ft Benning
Dept Of The Army · 24 wins · $25M

What it wins

Maintenance Of Other Administrative Facilities And Service Buildings
PSC Z1AZ · 14 wins · $13M
Construction Of Maintenance Buildings
PSC Y1EB · 9 wins · $12M
Construction Of Highways, Roads, Streets, Bridges, And Railways
PSC Y1LB · 1 win · $330K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
The Objective Of This Mechanical Scope Is To Increase The Reliability And Maintainability Of The Hvac System In B2862 Using A Multi-Prong Approach. This Building Has A Main Building Hvac System And A Dedicated Server Room Crah System.
W6qm Micc-Ft Benning · ends Sep 2027 · $1.8M
Iaw Attached Sow, Replace The Entire Existing Fire Alarm System With New Fire Alarm And Mass Notification Systems In Barracks, Building 9142
W6qm Micc-Ft Benning · ends Aug 2027 · $836K
Iaw Attached Sow: The Project Consists Of Replacing The Existing Failing Built-Up Gravel Roof\Nsystem In Entirety And To Make Necessary Repairs Of All Deficiencies In Conjunctionwith The Roof Replacements
W6qm Micc-Ft Benning · ends Nov 2026 · $747K
Iaw The Attached Sow Project Is To Replace The Entire Existing Fire Alarm System With New Fire Alarm And Mass Notification Systems In The Building.
W6qm Micc-Ft Benning · ends Jul 2027 · $700K
Iaw With The Attached Sow This Project Will Replace 61 Old Ground Fixtures With New Fixtures, Re-Lamp All New Fixtures, And Stock Up Spare Parts. There Are 16 Red And 45 Clear Lenses.
W6qm Micc-Ft Benning · ends Jul 2027 · $300K

Recent awards

DateWhatOfficeValueOffers
Jun 2026The Objective Of This Mechanical Scope Is To Increase The Reliability And Maintainability Of The Hvac System In B2862 Using A Multi-Prong Approach. This Building Has A Main Building Hvac System And A Dedicated Server Room Crah System.W6qm Micc-Ft Benning$1.8M—
Jun 2026Iaw The Attached Sow Project Is To Replace The Entire Existing Fire Alarm System With New Fire Alarm And Mass Notification Systems In The Building.W6qm Micc-Ft Benning$700K—
Jun 2026Iaw With The Attached Sow This Project Will Replace 61 Old Ground Fixtures With New Fixtures, Re-Lamp All New Fixtures, And Stock Up Spare Parts. There Are 16 Red And 45 Clear Lenses.W6qm Micc-Ft Benning$300K—
May 2026Iaw Attached Sow, Replace The Entire Existing Fire Alarm System With New Fire Alarm And Mass Notification Systems In Barracks, Building 9142W6qm Micc-Ft Benning$836K—
Sep 2025Iaw The Attached Sow: Repair Exterior/Interior Of Px Facility, Building 11on Camp Merrill, Dahlonega, GeorgiaW6qm Micc-Ft Benning$1.9M—
Sep 2025Iaw Attached Sow: The Project Consists Of Replacing The Existing Failing Built-Up Gravel Roof\Nsystem In Entirety And To Make Necessary Repairs Of All Deficiencies In Conjunctionwith The Roof ReplacementsW6qm Micc-Ft Benning$747K—
Sep 2025Iaw With The Attached Sow, The Project Consists Of Replacing The Existing Roof System For Building 4405 (Built 2011) In Entirety And To Make Necessary Repairs Of All Deficiencies In Conjunction With The Roof ReplacementsW6qm Micc-Ft Benning$2.9M—
Sep 2025Iaw The Attached Sow, The Project Consists Of Replacing The Existing Failing Asphalt Roof System And Roof Deck In EntiretyW6qm Micc-Ft Benning$679K—
Sep 2025Iaw With Attached Sow: The Contractor Will Install 12 Strands Of Single Mode Fiber Between Nec Hut 8856 And Bldg. 2786. The Contractor Will Install 25 Pair Of Copper Between Mh Ex Tw25 And Bldg. 2786.W6qm Micc-Ft Benning$335K—
Aug 2025Iaw The Sow: This Project Will Update Several Interior And Exterior Repairs To The Mentioned Range Shed Facility. The Electrical Service Will Need To Be Assessed To Verify Capacity To Meet The Power Requirement Of The Additional Electrical Devices.W6qm Micc-Ft Benning$349K—
Aug 2025Iaw The Sow: This Project Involves Converting An Existing Vault Latrine Into A Modern Flushable Facility With An Exterior \Nhand Washing Station.W6qm Micc-Ft Benning$368K—
Aug 2025This Project Is To Repair Roof And Interior Water Damage In Bldg 2815. Work Includes But Is Not Limited To Providing A New Pvc Roof, Window Replacement, Stucco Repair, And Remediation Of Any Microbial Growth In The Interior Iaw Attached Sow.W6qm Micc-Ft Benning$343K—
Jul 2025Removal Of Existing 20 Ton Johnson Controls Package Unit, Hvac Controls And Floor Diffusers In Bldg 2929. New Work Includes But Not Limited To Providing And Installing New Heat Pump Package, Jace 9200, And Thermostats In Accordance With Attached SowW6qm Micc-Ft Benning$368K—
Jun 2025Iaw Sow: Replace Five Traffic Light Infrastructure. This Project Will Replace The Traffic Control Nema Cabinets, Traffic Signal Controllers, Traffic Surveillance Video Cameras, The Malfunction Management Units (Mmu),W6qm Micc-Ft Benning$940K—
Sep 2024Construct Wtc Foundary Facility BldgW6qm Micc-Ft Benning$2.2M—
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Don Jones Construction Co., INC.? Request a correction.