| Jul 2026 | The Complete Removal Of Existing Carpet Floor And Cove Base From The Floors Of Bldg. 9001, Iaw The Project Drawings, And Install New Tile With A Manufacturer Recommended Adhesive, Self-Leveling And Cove Base Where Flooring Has Been Removed. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $47K | 3 |
| Jul 2026 | Remove And Replace One (1) 3-Ton Condensing Unit, One (1) 3-Ton Furnace Assembly, And Two (2) Gas-Fired Hanging Heaters At Building 9120. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $37K | 1 |
| Mar 2026 | Convert B7298 To Housing Office Small Business Set Aside - Total | Fa4661 7 Cons Cd | $135K | 2 |
| Feb 2026 | This Order Is To Replace A Compressor At Building 7008. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $15K | 2 |
| Sep 2025 | Cleaning, Priming And Application Of An 80-Mil Seamless Polyurea Coating To The Roof Of Building 7115 - The Bowling Alley. | Fa4661 7 Cons Cd | $179K | 8 |
| Aug 2025 | Remove Old Flooring Including Asbestos And Cove Base In Building 5102 Per Drawings. Install Luxury Vinyl Tile With Recommended Adhesive And New Cove Base Where Flooring Was Removed. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $62K | 2 |
| Aug 2025 | Removal Of Four (4) Wooden Door In Building 7238, And Purchase/Installation Of Four (4) Glass Doors In Same Locations Of Removed Doors. All Work Must Me Standards As Outlined In The Attached Statement Of Work. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $20K | 4 |
| Aug 2025 | Remove Existing Flooring (Carpet, Tile, Cove Base) In B5015 And Install 3, 700 Sq Ft Of Dyess Standard Brown Lvt With Cove Base. Includes Submittals, Site Visit, And Compliance With Codes. 60-Day Project, Minimal Disruption To Occupants. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $44K | 3 |
| Jul 2025 | Renovate The Carpet, Tiles And Paint On B5110 Floor. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $21K | 3 |
| Jul 2025 | Demo/Dispose Of Tile, Fixtures In Restrooms 133 And 134. Install Self-Leveling Subfloor, Tile, Drywall, Thresholds, Exhaust Fans, Shower Floors, Tile Walls, And Showerheads. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $112K | 1 |
| Jul 2025 | The Contractor Shall Provide All Labor, Equipment, Tools, Material, Supervision, And Any Other Items Necessary To Properly Remove The Carpeting, Tiles And Paint From B5110 Floor. Small Business Set Aside - Total | Fa4661 7 Cons Cd | $43K | 3 |
| May 2025 | The Purpose Of This Task Order Is To Replace The Section Flooring For Building 7008. | Fa4661 7 Cons Cd | $22K | 3 |
| Sep 2024 | The Purpose Of This Task Order Is For The Floor Replacement In Building 7215. | Fa4661 7 Cons Cd | $110K | 3 |