ZukoBid.
Try it free
Federal contractor profile

Kwest Enterprises LLC

Montgomery, AL · Not a small business
UEI Z1BGD4F8CVA9 · CAGE 5YNJ8
Contracts won
20
since Aug 2024 · last Jul 2026
Total value
$9.4M
including options
Buying offices
1
government offices it sold to
Usual competition
4 offers
10% of its wins had one offer

Wins by fiscal year

FY2024
4 · $2.7M
FY2025
8 · $5.0M
FY2026
8 · $1.7M

Who it sells to

Fa3300 42 Cons Cc
Dept Of The Air Force · 20 wins · $9.4M

What it wins

Repair Or Alteration Of Miscellaneous Buildings
PSC Z2JZ · 7 wins · $1.7M
Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
PSC J041 · 3 wins · $746K
Repair Or Alteration Of Other Non-Building Facilities
PSC Z2PZ · 2 wins · $1.3M
Installation Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
PSC N041 · 2 wins · $1.2M
Maintenance Of Other Administrative Facilities And Service Buildings
PSC Z1AZ · 1 win · $2.8M
Maint/Repair/Rebuild Of Equipment- Pumps And Compressors
PSC J043 · 1 win · $577K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
The Demolition Of Buildings 77, 122, 142, 143 And The Construction Of A Pre-Engineered Storage Building On Maxwell AFB, Alabama
Fa3300 42 Cons Cc · ends Jan 2027 · $553K

Recent awards

DateWhatOfficeValueOffers
Jul 2026Fy26 Form 9 Awc Fire Escapes Repair - Bldg. 1401
Small Business Set Aside - Total
Fa3300 42 Cons Cc$116K3
Jun 2026The Demolition Of Buildings 77, 122, 142, 143 And The Construction Of A Pre-Engineered Storage Building On Maxwell AFB, AlabamaFa3300 42 Cons Cc$553K4
Apr 2026Contractor Shall Furnish All Plant, Labor, Materials And Equipment Necessary To Perform All Work In Connection With Project Jubj 26-8833 Repair Dayroom Flooring Building 1410 At Gunter Annex Alabama, In Accordance With The Attached Specs And Dwgs.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$25K4
Mar 2026Multiple Award Task Order Contract To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.Fa3300 42 Cons Cc$300K4
Mar 2026Multiple Award Task Order Contract To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$70K1
Mar 2026Multiple Award Task Order Contract To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.Fa3300 42 Cons Cc$36K1
Feb 2026Maxwell AFB Airfield Improvements.\N\Nthe Estimated Magnitude Of This Construction Project Is Between $250, 000.00 And $500, 000.00.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$354K13
Nov 2025Flooring Replacement
Small Business Set Aside - Total
Fa3300 42 Cons Cc$243K4
Sep 2025Task Order (Matoc) To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$2.8M3
Sep 2025Installation Of The Laundry Heat Exchanger In Building 912, Maxwell AFB, Alabama.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$45K3
Sep 2025Multiple Award Task Order Contract To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.Fa3300 42 Cons Cc$126K4
Sep 2025Multiple Award Task Order Contract To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$220K5
Sep 202542ces Jubj 23-4636 Replace Chillers Building 863\N\Nthe Estimated Magnitude Of This Project Is Between $250, 000 And $500, 000.\N\Nthis Requirement Is Being Set Aside As A 100% Small Business Set Aside.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$456K6
Aug 2025Furnish All Plant, Labor, Equipment And Materials And Perform All Operations In Connection With The Gas Line Repair (Project # Pnqs 25-8705) To Include All Areas As Indicated On Drawings And In Strict Accordance With The Specifications.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$249K3
Jul 2025Multiple Award Task Order Contract To Fulfill Various Minor Construction Contract Requirements (Including Minor Designs) For Maxwell AFB, Gunter Annex, Lake Martin Recreation Area (Lmra), And Vigilant Warrior Training Site In Alabama.
Small Business Set Aside - Total
Fa3300 42 Cons Cc$577K4
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Kwest Enterprises LLC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Kwest Enterprises LLC? Request a correction.