ZukoBid.
Try it free
Federal contractor profile

Estes Bros. Const. INC.

Jonesville, VA · Not a small business
UEI YKVNGM329N76 · CAGE 1TXC5
Contracts won
11
since Apr 2024 · last Jul 2026
Total value
$86M
including options
Buying offices
1
government offices it sold to
Usual competition
3 offers
0% of its wins had one offer

Wins by fiscal year

FY2024
4 · $24M
FY2025
3 · $38M
FY2026
4 · $25M

Who it sells to

693c73 Eastern Fed Lands Division
Federal Highway Administration · 11 wins · $86M

What it wins

Construction Of Highways, Roads, Streets, Bridges, And Railways
PSC Y1LB · 11 wins · $86M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Np Natr 3n18, 3h27, Etc - Geotechnical, Pavement Rehabilitation, And Structural Repairs Between Mp 121 And Mp 204 (Phase 2), Project Ms Np Natr 3n18 3h27 Etc, Solicitation Number 693c73-25-B-000003, Located In Attala, Choctaw, Leake, Madison, And Web
693c73 Eastern Fed Lands Division · ends Jun 2027 · $33M
Project Nc Np Blri 2m30:\N\Nthe Project Consists Of Hurricane Damage Repairs At Mp 342.7, 343.7 And 343.8. The Work Includes Slide Repairs, Culvert Replacement And Cleaning, Stone Masonry Headwall Installation, Riprap Placement, Curb And Guardrail In
693c73 Eastern Fed Lands Division · ends Jun 2027 · $13M
Project VA Np Blri 1k1:\Nthe Project Consists Of Pavement Rehabilitation From Mp 86 To Mp 89 On The Blue Ridge Parkway. The Work Includes Full Depth Reclamation, Drainage Improvement, Signage, And Other Miscellaneous Work.
693c73 Eastern Fed Lands Division · ends Jan 2027 · $5.7M

Recent awards

DateWhatOfficeValueOffers
Jul 2026Project Tn Erfo Fs Chrke804 2021-1(2):\Nthe Project Consists Of Design Services, Slope Stabilization, Roadway Reconstruction, Asphalt Concrete Pavement, And Other Miscellaneous Work.
Small Business Set Aside - Total
693c73 Eastern Fed Lands Division$2.8M3
Feb 2026Project VA Np Blri 1k1:\Nthe Project Consists Of Pavement Rehabilitation From Mp 86 To Mp 89 On The Blue Ridge Parkway. The Work Includes Full Depth Reclamation, Drainage Improvement, Signage, And Other Miscellaneous Work.
Small Business Set Aside - Total
693c73 Eastern Fed Lands Division$5.7M8
Nov 2025Project Nc Np Blri 2m30:\N\Nthe Project Consists Of Hurricane Damage Repairs At Mp 342.7, 343.7 And 343.8. The Work Includes Slide Repairs, Culvert Replacement And Cleaning, Stone Masonry Headwall Installation, Riprap Placement, Curb And Guardrail In693c73 Eastern Fed Lands Division$13M—
Oct 2025Tn Np Grsm 11(6):\Nthe Project Consists Of Repairing Pavement Edge Drop-Offs, Removing Or Paving Gravel Pull-Off Areas And Replacing Timber Guardrail. The Work Includes Shoulder Hardening, Which Consists Of Constructing A 2-Foot Wide Asphalt Paved Sh693c73 Eastern Fed Lands Division$3.1M—
Mar 2025Np Natr 3n18, 3h27, Etc - Geotechnical, Pavement Rehabilitation, And Structural Repairs Between Mp 121 And Mp 204 (Phase 2), Project Ms Np Natr 3n18 3h27 Etc, Solicitation Number 693c73-25-B-000003, Located In Attala, Choctaw, Leake, Madison, And Web693c73 Eastern Fed Lands Division$33M3
Dec 2024Project Tn Erfo Fs 2019-1(2):\Nthe Project Consists Of Reconstructing Sink Mountain Launch Road And Constructing A New Parking Area. The Work Includes Clearing And Grubbing, Embankment Construction, Asphalt Pavement, Reinforced Concrete Box Culvert I693c73 Eastern Fed Lands Division$3.2M—
Nov 2024Project Ms Np Natr 3p27: The Project Consists Of Milling And Overlay Of Multi-Use Trails, Asphalt Concrete Rehabilitation, Aggregate Surfacing, Minor Trail Profile Adjustments, And Other Miscellaneous Work.693c73 Eastern Fed Lands Division$1.8M—
Sep 2024Project Np Blri Pvt Pres Fy24(1):\Nthe Project Consists Of Pavement Preservation On The Blue Ridge Parkway Mainline From Milepost 121 To Milepost 143. The Work Includes Placement Of Chip Seal And Fog Seal, Patching, Crack Cleaning And Sealing, Paveme693c73 Eastern Fed Lands Division$2.4M—
May 2024Project VA Np Blri Bms Fy23(1):\Nthe Project Consists Of Performing Preventative Bridge Repairs To 18 Bridges Along The Blue Ridge Parkway. The Work Includes Repointing Stone Masonry Joints, Cleaning And Coating Exposed Rebar, Cleaning And Resealing693c73 Eastern Fed Lands Division$794K—
May 2024Project Np Natr 3n17, 3h26, Etc. - The Project Consists Of The Drainage Improvements Of The Natchez Trace Parkway (Natr) From Milepost (Mp) 121 To Mp 204 Including Some Parking Areas. The Work Consists Of Design And Installation Of Designated Inlets693c73 Eastern Fed Lands Division$20M3
Apr 2024Project Fl Np Deso 900(1): The Project Consists Of Resurfacing The Visitor Entrance Road And Parking Areas. The Work Includes Milling And Overlay, Full Depth Patch, And Other Miscellaneous Work.693c73 Eastern Fed Lands Division$302K—
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Estes Bros. Const. INC. →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Estes Bros. Const. INC.? Request a correction.