Federal contractor profile

Rmf Engineering, INC., P.C.

Baltimore, MD · Not a small business · Part of Rmf Engineering INC. P.C.
UEI Y7YJFTG997E7 · CAGE 0FRJ3
Contracts won
46
since Jan 2024 · last Sep 2026
Total value
$42M
including options
Buying offices
5
government offices it sold to
Usual competition
1 offer
89% of its wins had one offer

Wins by fiscal year

FY2024
14 · $4.8M
FY2025
14 · $4.0M
FY2026
18 · $34M

Who it sells to

Nih A E Construction
National Institutes Of Health · 39 wins · $17M
National Institutes Of Health Olao
National Institutes Of Health · 4 wins · $703K
Acquisitions - Aqm Momentum
State, Department Of · 1 win · $25M
Office Of The Chief Procurement Officer
Bureau Of Engraving And Printing · 1 win · $71K
Mission Support Washington
U.S. Immigration And Customs Enforcement · 1 win · $37K

What it wins

Architect And Engineering- General: Other
PSC C219 · 44 wins · $42M
Support- Professional: Engineering/Technical
PSC R425 · 2 wins · $107K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
C116492 - Contract Ae Peer Reviews, Logic Diagrams, Cx/Bas Support, Rca For Intramural Projects - Base Period - Jordan Blackburn
Nih A E Construction · ends Jul 2027 · $543K
C200863 - Design For Transferring Consolidated Cooling Tower Blowdown Discharge Of Central Utility Plant To Sanitary Sewer System. Bldg. 11, Andrew Gomes
National Institutes Of Health Olao · ends Apr 2027 · $525K
C202006: This Project Provides Design Services To Replace The Cafeteria Ahu 3, 4 & 5, Including Associated Ductwork, Piping, And Controls.
Nih A E Construction · ends Jul 2027 · $481K
The Project Consists Of Replacing The Existing Air Handling Units Ahu-B-1, Ahu-1, And Ahu-2 Which Are Located In The Penthouse Of Building 31b 35% Design
Nih A E Construction · ends Jan 2027 · $404K
C202026: This Project Provides A Design To Replace All The Single Pane Windows With Double Pane Windows Throughout And Replace The Induction Units And Finishes.
Nih A E Construction · ends Apr 2027 · $358K

Recent awards

DateWhatOfficeValueOffers
Sep 2026C202006: This Project Provides Design Services To Replace The Cafeteria Ahu 3, 4 & 5, Including Associated Ductwork, Piping, And Controls.Nih A E Construction$481K1
Sep 2026C202026: This Project Provides A Design To Replace All The Single Pane Windows With Double Pane Windows Throughout And Replace The Induction Units And Finishes.Nih A E Construction$358K1
Sep 2026C102231 - Construction Quality Management Services, RtpNih A E Construction$3.4M1
Sep 2026C106722 - Post Design - Upgrade Cup Condensate Pumps, B11, Wayne SmallsNih A E Construction$136K1
Sep 2026C202399 Design Study, Inspection, Survey And Emergency Design- Chiller/Steam Tunnel That Connects Bldg. 11, 13, 14Nih A E Construction$68K1
Sep 2026Design Services Multiple Air Handling Units Replacement, Building 49, B2 Level Ahu-1 Through Ahu-9Nih A E Construction$2.2M1
Sep 2026C116052 Construction Quality Management (Cqm) Support Services For Groundwater Intrusion, Bldg 11Nih A E Construction$101K1
Jul 2026Building 6 B303 Hvac Replacement & Upgrades -Design & Post Design ServicesNih A E Construction$502K1
Jul 2026The Project Consists Of Replacing The Existing Air Handling Units Ahu-B-1, Ahu-1, And Ahu-2 Which Are Located In The Penthouse Of Building 31b 35% DesignNih A E Construction$404K13
Jun 2026C109059 - Perform Refresh Ae Design For Installing Cup Tess Side Stream Filtering. Building 34, Andrew GomesNih A E Construction$54K1
Jun 2026C200863 - Design For Transferring Consolidated Cooling Tower Blowdown Discharge Of Central Utility Plant To Sanitary Sewer System. Bldg. 11, Andrew GomesNational Institutes Of Health Olao$525K1
May 2026C201896-Design Durable Permanent Work Platforms In The Nih Central Utility Plant Chiller Areas-Five On The New Chiller Side And Four On The Old Chiller Side-To Provide Personnel With Safe Access To Elevated Valves-Elizabeth OluwafemiNational Institutes Of Health Olao$56K1
Apr 2026C104562 Mh88 To Vv87a Steam Replacement Design Update To Meet Building Codes And Drm Updated Standards. Implementation Of Pcas To Support Construction. Without Support Services Construction Cannot Move Forward.Nih A E Construction$65K1
Apr 2026Worldwide Commissioning Engineering Services IdiqAcquisitions - Aqm Momentum$25M12
Mar 2026C201593 Post Design And Ca Services For Cup Leak Repair At 36 In. Chw Piping, Bldg 11, Wayne SmallsNational Institutes Of Health Olao$65K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Rmf Engineering, INC., P.C. →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Rmf Engineering, INC., P.C.? Request a correction.