ZukoBid.
Try it free
Federal contractor profile

Yerba Buena Engineering & Construction, INC.

San Francisco, CA · Not a small business · Part of Yerba Buena Engineering & Construction INC.
UEI U81LJLAULU79 · CAGE 3B3W8
Contracts won
25
since Jan 2024 · last Sep 2026
Total value
$20M
including options
Buying offices
9
government offices it sold to
Usual competition
3 offers
21% of its wins had one offer

Wins by fiscal year

FY2024
9 · $12M
FY2025
9 · $1.6M
FY2026
7 · $5.9M

Who it sells to

Pwr Goga(86000)
National Park Service · 8 wins · $2.0M
US Mint Headquarters
United States Mint · 6 wins · $538K
Pwr Sf/Sea Mabo(85000)
National Park Service · 3 wins · $1.2M
Dsc Contracting Services Division
National Park Service · 2 wins · $11M
697dck Regional Acquisitions Svcs
Federal Aviation Administration · 2 wins · $477K
W075 Endist Sacramento
Dept Of The Army · 1 win · $4.5M

What it wins

Repair Or Alteration Of Production Buildings
PSC Z2EC · 6 wins · $538K
Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
PSC Z2LB · 3 wins · $11M
Maintenance Of Miscellaneous Buildings
PSC Z1JZ · 2 wins · $1.1M
Repair Or Alteration Of Office Buildings
PSC Z2AA · 2 wins · $489K
Construction Of Office Buildings
PSC Y1AA · 2 wins · $445K
Maintenance Of Water Supply Facilities
PSC Z1NE · 2 wins · $162K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
The Project Entails Roadway And Pathway Improvements Intended To Accommodate Cyclists And Pedestrians In An Area Congested With Vehicle Traffic. The Project Includes Construction Of A New Paved Bike Path Along The Perimeter Of The West Bluff Trailhea
Dsc Contracting Services Division · ends Aug 2027 · $4.9M
Goga Remove Presidio Bldg 1648
Pwr Goga(86000) · ends Jan 2027 · $247K
Oakland Artcc Test And Training Laboratory Lighting Replacement
697dck Regional Acquisitions Svcs · ends Dec 2026 · $239K
Sf Catoning Line Electrical Services
US Mint Headquarters · ends Sep 2027 · $215K
The Purpose Of This Order To Execute Flooring Resurfacing Prior To The Line Installation For The Cartoning Line At The United States Mint-San Francisco.
US Mint Headquarters · ends Sep 2027 · $106K

Recent awards

DateWhatOfficeValueOffers
Sep 2026Sf Catoning Line Electrical ServicesUS Mint Headquarters$215K—
Sep 2026Goga Remove Presidio Bldg 1648
Small Business Set Aside - Total
Pwr Goga(86000)$247K3
Aug 2026The Project Entails Roadway And Pathway Improvements Intended To Accommodate Cyclists And Pedestrians In An Area Congested With Vehicle Traffic. The Project Includes Construction Of A New Paved Bike Path Along The Perimeter Of The West Bluff Trailhea
Small Business Set Aside - Total
Dsc Contracting Services Division$4.9M4
Aug 2026The Purpose Of This Order To Execute Flooring Resurfacing Prior To The Line Installation For The Cartoning Line At The United States Mint-San Francisco.US Mint Headquarters$106K—
Aug 2026Oakland Artcc Test And Training Laboratory Lighting Replacement
Small Business Set Aside - Total
697dck Regional Acquisitions Svcs$239K15
Jul 2026Roof Replacement - Sea Scout Building
Small Business Set Aside - Total
Pwr Goga(86000)$99K1
Jul 2026Replace Irrigation Supply Line In Aquatic Park, San Francisco Maritime National Historical Park
Small Business Set Aside - Total
Pwr Goga(86000)$64K2
Sep 2025The 60th Civil Engineering Squadron Has A Requirement To Replace Various Gas Meters At Multiple Buildings Across The Installation.
Small Business Set Aside - Total
Fa4427 60 Cons Lgc$108K11
Sep 2025Cm Replace Retaining Wall Bocce-Van Ness
Small Business Set Aside - Total
Pwr Sf/Sea Mabo(85000)$833K5
Sep 2025Hvac ReplacementMp-Regional Office$50K1
Aug 2025The Purpose Of This Order Is For Exterior Window Replacement And Repair At The United States Mint-San Francisco. \Nthis Order Replaces Order Number 2031jg25f00147 Which Inadvertently Included The Incorrect Contractor.US Mint Headquarters$67K—
Jul 2025The Department Of The Interior, National Park Service, Is Awarding 140p8525p0039 For The Replacement Of An Irrigation System At The John Muir National Historic Site. The Contractor Shall Provide All Mobilization, Labor, Supervision, Materials, Equipm
Small Business Set Aside - Total
Pwr Sf/Sea Mabo(85000)$236K2
Jun 2025Goga-2025 Ocean Beach Sand Mgmt
Small Business Set Aside - Total
Pwr Sf/Sea Mabo(85000)$163K5
Apr 2025The Purpose Of This Order Is For Exterior Window Replacement And Repair At The United States Mint-San Francisco.US Mint Headquarters$67K—
Mar 2025The Purpose Of This Order Is For The Modification Of The Fifth Floor Guardrail At The United States Mint-San Francisco.US Mint Headquarters$26K—
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Yerba Buena Engineering & Construction, INC.? Request a correction.