ZukoBid.
Try it free
Federal contractor profile

Pettibone Concrete Construction, INC.

Panama City, FL · Not a small business · Part of Pettibone Concrete Construction INC
UEI U1YMVMNJQ9C7 · CAGE 1BFN3
Contracts won
9
since Dec 2023 · last May 2026
Total value
$11M
including options
Buying offices
1
government offices it sold to
Usual competition
—

Wins by fiscal year

FY2024
4 · $1.8M
FY2025
3 · $958K
FY2026
2 · $8.7M

Who it sells to

Fa4819 325 Cons Pkp
Dept Of The Air Force · 9 wins · $11M

What it wins

Repair Or Alteration Of Miscellaneous Buildings
PSC Z2JZ · 7 wins · $11M
Repair Or Alteration Of Airport Runways And Taxiways
PSC Z2BD · 1 win · $98K
Repair Or Alteration Of Electronic And Communications Facilities
PSC Z2BG · 1 win · $62K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Repair Existing Stormwater Infrastructure (Drainpipe And Inlet Structures) At Selected Areas Within The Tyndall AFB Main Airfield. The Existing Stormwater Infrastructure Is In Degraded \Ncondition And Needs To Be Replaced.
Fa4819 325 Cons Pkp · ends May 2027 · $7.4M

Recent awards

DateWhatOfficeValueOffers
May 2026Repair Existing Stormwater Infrastructure (Drainpipe And Inlet Structures) At Selected Areas Within The Tyndall AFB Main Airfield. The Existing Stormwater Infrastructure Is In Degraded \Ncondition And Needs To Be Replaced.Fa4819 325 Cons Pkp$7.4M—
Mar 2026Maintenance Of Airfield Paint And RubberFa4819 325 Cons Pkp$1.3M—
Aug 2025Repair TaxiwayFa4819 325 Cons Pkp$95K—
Aug 2025Airfield Marking Repairs And PaintingFa4819 325 Cons Pkp$834K—
Jan 2025Install Six New Grounding Points At Selected Areas Of The Former Alert Pad Apron For Temporary E-9 Operations Per The Sow Dated 20 Nov 2024 .Fa4819 325 Cons Pkp$28K—
Jun 2024Repair Existing Barrier Foundations On Drone RunwayFa4819 325 Cons Pkp$771K—
Apr 2024The Government Requests A Proposal To Repair Existing Taxiway K Concrete Surface For Future E-9 Aircraft Operations.Fa4819 325 Cons Pkp$98K—
Feb 2024Concrete Slab Replacement Support For Research, Development, Test And Evaluation Projects At Tyndall AFB.Fa4819 325 Cons Pkp$62K—
Dec 2023Maintain Airfield Paint Markings On The Tyndall Flightline And Remove Excess Rubber Buildup On The Main Airfield Runways.Fa4819 325 Cons Pkp$872K—
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Pettibone Concrete Construction, INC.? Request a correction.