ZukoBid.
Try it free
Federal contractor profile

Medved Global INC

Cortez, CO · Small business · Part of Medved Global LLC
UEI TCK7C1U8EMH9 · CAGE 617W5
Contracts won
17
since Aug 2024 · last Sep 2026
Total value
$5.0M
including options
Buying offices
4
government offices it sold to
Usual competition
3 offers
35% of its wins had one offer

Wins by fiscal year

FY2024
3 · $691K
FY2025
9 · $1.8M
FY2026
5 · $2.5M

Who it sells to

Usda-Fs, Csa Intermountain 8
Forest Service · 13 wins · $4.9M
Usda Forest Service-Spoc Im
Forest Service · 2 wins · $31K
Colorado State Office
Bureau Of Land Management · 1 win · $113K
Imr Intermountain Region(1200)
National Park Service · 1 win · $20K

What it wins

Construction Of Highways, Roads, Streets, Bridges, And Railways
PSC Y1LB · 5 wins · $3.1M
Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
PSC Z2LB · 3 wins · $755K
Maintenance Of Highways/Roads/Streets/Bridges/Railways
PSC Z1LB · 1 win · $524K
Construction Of Sewage And Waste Facilities
PSC Y1ND · 1 win · $246K
Construction Of Water Supply Facilities
PSC Y1NE · 1 win · $120K
Construction Of Recreation Facilities (Non-Building)
PSC Y1PA · 1 win · $113K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
San Juan Nf Cattleguard Replacement Project,
Usda-Fs, Csa Intermountain 8 · ends Jun 2027 · $143K
Restore 8 Sjnf Road Bridges To Safe Conditions After October 2025 Flooding And Improve Their Resilience To Future High-Intensity Storm Events.
Usda-Fs, Csa Intermountain 8 · ends Nov 2026 · $138K

Recent awards

DateWhatOfficeValueOffers
Sep 2026Award - Trickel Park Road Asphalt Grand Mesa, Uncompahgre, And Gunnison National Forest, Colorado
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$1.5M6
Sep 2026Restore 8 Sjnf Road Bridges To Safe Conditions After October 2025 Flooding And Improve Their Resilience To Future High-Intensity Storm Events.
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$138K4
Sep 2026San Juan Nf Cattleguard Replacement Project,
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$143K8
Jul 2026Award North Clear Creek Falls Road And Parking Lot Repairs Rio Grand, Colorado
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$674K1
May 2026Culvert Replacement - Meadow Creek
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$84K4
Sep 2025Award San Juan Cattle Guard Replacement, San Juan National Forest, Durango, Colorado
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$459K8
Sep 2025Blm-Co Trfo Bradfield Campground Improvements
Small Business Set Aside - Partial
Colorado State Office$113K11
Sep 2025Critical Gaoa Paving Project To Protect Public Safety, Protect Existing Transportation Infrastructure, And Reduce Air Borne Particulate Matter. The Agency Contracts This Work Because IT Is Highly Efficient And Specialized Construction.
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$746K3
Sep 2025Mesa Verde Exhibit Glass Removal Service
Small Business Set Aside - Total
Imr Intermountain Region(1200)$20K2
Sep 2025The Contractor Shall Replace All Structural Members Identified In Statement Of Work To Ensure Long Term Structural Stability.
8(A) Sole Source
Usda-Fs, Csa Intermountain 8$47K1
Jul 2025Cap And Abandon Existing Well, Drill A New Well Including Water Lines And Electrical Trenching. Administrative Facilities Including Quarters Bunkhouses Utilize This Well.Usda-Fs, Csa Intermountain 8$120K1
Jun 2025Gaoa Replacement Of Toilets At Madden Creek Campground, Miller Creek Campground And Sig Creek Campground On The Columbine Ranger District
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$246K9
May 2025Replacement Of The Residential Boiler Unit And All Pipe, Fittings, Zone Valves, Expansion Tanks, Air Separators, System Pumps. All Old And Unused Equipment Is To Be Removed And Disposed OfUsda Forest Service-Spoc Im$20K1
Dec 2024Emergency Furnace ReplacementUsda Forest Service-Spoc Im$10K1
Sep 2024This Project Includes All Materials, Labor, And Equipment Necessary To Complete The Following Task Items: 1) Road Resurfacing A. Provide Aggregate And Reconstruct The 1.2 Miles Of Road Within The Campground. Work Includes Reshaping The Roadbed By
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$152K3
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Medved Global INC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Medved Global INC? Request a correction.