| Nov 2018 | This Statement Of Work Defines The Effort Required To Support The Prototype Integration Facility Quality Management System. In Order To Continue To Effectively Provide Best Value Products To Our Customers, A Systematic Approach That Addresses Best Practices For Daily Quality, Audit And Test Related Operations Is Needed. This Statement Of Work Identifies The Quality, Audit And Test Areas And The Process Needed To Provide The Best Support Of The Quality Management System. | W6qk Acc-Rsa | $259K | — |
| Nov 2018 | Order For Statement Of Work Recovery Of Airbase Denied Ordnance Phase 2. | W6qk Acc-Rsa | $1.8M | — |
| Nov 2018 | Upport The Thaad Project Office (Tpo) In The Design And Development Of The Thaad Assured Position, Navigation, And Timing (Pnt). The Thaad Pnt Includes 1pps Electromagnetic Interference (Emi) Filter, 1rigb 127 Emi Filter, +28vdc Emi Filter, Anti-Jam (Aj) Antenna Enclosure, Network Time Servers And Cables. | W6qk Acc-Rsa | $1.6M | 0 |
| Sep 2018 | 3.1. Kit Fabrication 3.1.1. (Base) The Contractor Shall Provide One (1) Kit, Iaw The Uh-60v Mechanical Kit Bill Of Material, As Detailed In Appendix B (Cpff). The Contractor Shall Provide Two (2) Kits, Iaw The Uh-60v Mechanical Kit Bill Of Material, As Detailed In Appendix B (Ffp). 3.1.2. (Option 1) The Contractor Shall Provide A Minimum Quantity Of Ten (10) Up To A Maximum Quantity Of Forty (40) Kits, Iaw The Uh-60v Mechanical Kit Bill Of Material, As Detailed In Appendix B. 3.1.3. (Option 2) The Contractor Shall Provide A Minimum Quantity Of Ten (10) Up To A Maximum Quantity Of Forty (40) Kits, Iaw The Uh-60v Mechanical Kit Bill Of Material, As Detailed In Appendix B. 3.1.4. (Option 3) Engineering Support The Contractor Shall Provide Engineering Support During The First Year Of Low Rate Initial Production (Lrip). Support Shall Include Engineering Support To The Production Line At Corpus Christi Army Depot (Ccad) And Updating Documentation To Include Engineering Change Proposals (Ecp) For Existing Drawings And/Or Work Packages And On Aircraft Activities At Redstone Arsenal. | W6qk Acc-Rsa | $107M | — |
| Sep 2018 | Procurement, Manufacturing, Design, Engineering, Kitting, And Shipping Of The US Forces Korea Fielding Package | W6qk Acc-Rsa | $5.3M | — |
| Aug 2018 | Provide Technical Support To The Precision Fires Rocket And Missile Systems (Pfrms) Project Office (Po) To Upgrade United Arab Emirates (Uae) High Mobility Artillery Rocket Systems (Himars) Launchers With Drivers Vision Enhancer (Dve), Crew Chief Restraint System (Ccrs), And Sapphire Glass / Transparent Armor Retrofit Kit. | W6qk Acc-Rsa | $950K | — |
| Aug 2018 | Requirement For Audio Wire Kits To Be Used In Conjunction With Maintenance Work Order (Mwo) 1-1520-271-50-44 On The Ch-47f. The Kits Will Be Used To Provide A Needed Repair Of The Inter Communications System (Ics) For Status Audio From The Common Missile Warning System (Cmws) To The Ics. | W6qk Acc-Rsa | $121K | — |
| Aug 2018 | The Prototype Integration Facility (Pif) Has A Requirement In Support Of The Littoral Combat Ship (Lcs) Program Execute Office (Peo) Pms 505 And The Mission Package Support Facility (Mpsf) In Deployment Of High Quality Hardware On Time And On Budget, Allowing Integration Of This Hardware Into A Joint Operational Environment. This Shall Include Acquisition, Sustainment, Engineering And Performance Management And Measurement Process Support. | W6qk Acc-Rsa | $1.5M | — |
| Aug 2018 | This Statement Of Work (Sow) Defines The Efforts For The Contractor To Provide Technical And Engineering Support Of Three (3) Lower Tier Project Office Patriot Launcher Stations, One (1) Virtual Launcher Station; Assist In Developing And Maintaining Threat Simulation Modeling For The Patriot Simulation Community; Provide Technical Support For Launcher Station Test Set (Lsts) Ethernet Interface; And Support Modifications And Test To Patriot Fielding Equipment. | W6qk Acc-Rsa | $124K | — |
| Aug 2018 | This Statement Of Work (Sow) Defines The Effort Required To Provide Test Assets For Amrdec Security Initiatives. | W6qk Acc-Rsa | $810K | — |
| Aug 2018 | This Statement Of Work (Sow) Defines The Effort Required For The Repair, Refurbishment, Fabrication, Integration, Technical And Field Support To The Lower Tier Project Office (Ltpo) And Letterkenny Army Depot (Lead). Both Ltpo And Lead Require Upgrades To Patriot Related Hardware And Testing Stations. In Addition, Field Support Is Required To Update Currently Fielded Assets. | W6qk Acc-Rsa | $2.0M | — |