ZukoBid.
Try it free
Federal contractor profile

P. Engineering, Pllc

San Antonio, TX · Not a small business · Part of P. Engineering Pllc
UEI NY1JD6SXZM44 · CAGE 91XS7
Contracts won
5
since Sep 2024 · last Sep 2026
Total value
$1.5M
including options
Buying offices
2
government offices it sold to
Usual competition
1 offer
80% of its wins had one offer

Wins by fiscal year

FY2024
1 · $286K
FY2025
3 · $603K
FY2026
1 · $577K

Who it sells to

Administration Facilities Training Contracting Division
U.S. Customs And Border Protection · 3 wins · $1.1M
Navfacsyscom Southeast
Dept Of The Navy · 2 wins · $412K

What it wins

Repair Or Alteration Of Maintenance Buildings
PSC Z2EB · 1 win · $577K
Installation Of Equipment- Plumbing, Heating, And Waste Disposal Equipment
PSC N045 · 1 win · $286K
Installation Of Equipment- Electric Wire And Power Distribution Equipment
PSC N061 · 1 win · $213K
Repair Or Alteration Of Recreation Facilities (Non-Building)
PSC Z2PA · 1 win · $199K
Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
PSC J041 · 1 win · $191K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
This Requirement Is For The Installation Of A Backup Power Generation System With Automatic Transfer Switch (Atc) At The Following Two (2) Locations: San Angelo Nasoc Administration Bldg., San Angelo Texas, San Angelo Mu2 Hangar, San Angelo Texas.
Administration Facilities Training Contracting Division · ends Oct 2027 · $577K

Recent awards

DateWhatOfficeValueOffers
Sep 2026This Requirement Is For The Installation Of A Backup Power Generation System With Automatic Transfer Switch (Atc) At The Following Two (2) Locations: San Angelo Nasoc Administration Bldg., San Angelo Texas, San Angelo Mu2 Hangar, San Angelo Texas.Administration Facilities Training Contracting Division$577K1
Sep 20252.1.\Tthe Contractor Shall Provide And Install 2 Exhaust Fans At The South End Of The Lean To Hanger And 2 Intake Vents At The North End Of The Hanger. Both Exhaust And Intake Shall Be Required To Move 12000cfm Per Fan.
8(A) Sole Source
Administration Facilities Training Contracting Division$191K1
Sep 2025Convert Five Aircraft Power Receptacle Pairs In Cnatra Hangar 42 From 208v To 480v Per Nec And Site Standards To Support Equipment Requiring 480v.See Sow Section 01 00 00 - General Requirements For Full Specifications.
8(A) Sole Source
Navfacsyscom Southeast$213K1
Jul 2025B4706 Playground Repair At Nas Kingsville, Texas.
8a Competed
Navfacsyscom Southeast$199K5
Sep 2024Install Hvac For Holding AreaAdministration Facilities Training Contracting Division$286K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with P. Engineering, Pllc →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about P. Engineering, Pllc? Request a correction.