ZukoBid.
Try it free
Federal contractor profile

Seh - Tepa Es JV LLC

Kansas City, MO · Not a small business · Part of Integrated Infrastructure Partners JV LLC
UEI NLEPEFDKY433 · CAGE 9AZH1
Contracts won
32
since May 2024 · last Jul 2026
Total value
$12M
including options
Buying offices
7
government offices it sold to
Usual competition
1 offer
83% of its wins had one offer

Wins by fiscal year

FY2024
18 · $4.2M
FY2025
9 · $4.9M
FY2026
5 · $3.0M

Who it sells to

W6qm Micc Ft Mccoy (Rc)
Dept Of The Army · 17 wins · $4.0M
Div Of Engineering Svcs - Seattle
Indian Health Service · 6 wins · $1.5M
Fws, Gaoa
U.S. Fish And Wildlife Service · 3 wins · $4.0M
W07v Endist St Paul
Dept Of The Army · 3 wins · $1.6M
Bureau Of Indian Affairs
Bureau Of Indian Affairs · 1 win · $387K
Fa4610 30 Cons Pk
Dept Of The Air Force · 1 win · $339K

What it wins

Architect And Engineering- General: Other
PSC C219 · 24 wins · $9.7M
Architect And Engineering- Construction: Hospitals And Infirmaries
PSC C1DA · 6 wins · $1.5M
Architect And Engineering- General: Electrical Systems
PSC C222 · 1 win · $522K
Architect And Engineering- General: Structural Engineering
PSC C220 · 1 win · $339K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
VA-Div-Fac, Eq, Trans-Natl Bridge Insp-Bpa
Fws, Gaoa · ends May 2027 · $1.3M
The Purpose Of This Task Order Is For The Architect-Engineer To Prepare 100% Design And Specifications In Support Of The Fountain City Service Base (Fcsb) Building 9 Replacement.
W07v Endist St Paul · ends Sep 2027 · $877K
Provide All Parts, Labor, Tools, Equipment, Materials, Transportation, And Supervision Necessary To Replace Culvert At Training Area C12 Repair Walking Bridge Ftb43 At Fort Mccoy, Wi In Accordance With The Specs, Drawings And Contract Documents.
W6qm Micc Ft Mccoy (Rc) · ends Sep 2027 · $324K
Gp25wb400c02 & Gp25ky400c02 Kyle-Wanblee Parking Lot Design
Div Of Engineering Svcs - Seattle · ends Mar 2027 · $287K

Recent awards

DateWhatOfficeValueOffers
Jul 2026Provide Design Documentation For Repair Of Deficiencies At Central Vehicle Wash, Fort Mccoy WisconsinW6qm Micc Ft Mccoy (Rc)$216K—
Jul 2026Provide All Parts, Labor, Tools, Equipment, Materials, Transportation, And Supervision Necessary To Replace Culvert At Training Area C12 Repair Walking Bridge Ftb43 At Fort Mccoy, Wi In Accordance With The Specs, Drawings And Contract Documents.W6qm Micc Ft Mccoy (Rc)$324K—
Jun 2026The Purpose Of This Task Order Is For The Architect-Engineer To Prepare 100% Design And Specifications In Support Of The Fountain City Service Base (Fcsb) Building 9 Replacement.W07v Endist St Paul$877K1
Jun 2026VA-Div-Fac, Eq, Trans-Natl Bridge Insp-BpaFws, Gaoa$1.3M—
Dec 2025Rosebud Multiplex DesignDiv Of Engineering Svcs - Seattle$298K—
Sep 2025Provide All Parts, Labor, Tools, Equipment, Materials, Transportation, And Supervision Necessary To Conduct Critical Load Study (Wo 4143): At Fort Mccoy, Wisconsin In Accordance With The Specifications, Drawings And Contract Documents.W6qm Micc Ft Mccoy (Rc)$522K—
Sep 2025Fy 2025 Bridge Inspections Task Order, Three (3) Trips For The 2025 Usfws Bridge InspectionsFws, Gaoa$1.4M—
Aug 2025VA-Div Of Facilities-Bridge InspectionsFws, Gaoa$1.4M—
Aug 2025Gp25wb400c02 & Gp25ky400c02 Kyle-Wanblee Parking Lot DesignDiv Of Engineering Svcs - Seattle$287K—
Jul 2025Pine Ridge School Hvac & Water Heater Upgrade 100% Design ServicesBureau Of Indian Affairs$387K6
Apr 2025Provide All Parts, Labor, Tools, Equipment, Materials, Transportation, And Supervision Necessary To-Design Upgrade Multiple Campsites At Pineview To Full Hook Up B8048/B8053W6qm Micc Ft Mccoy (Rc)$221K—
Apr 2025Ae Services Reno BottomsW07v Endist St Paul$585K1
Feb 2025Provide All Parts, Labor, Tools, Equipment, Materials, Transportation, And Supervision: Necessary Design Replace Double Barrell Culvert On Pow Rd. To- (Wo 3636): At Fort Mccoy, Wisconsin Iaw The Specifications, Drawings, And Contract DocumentsW6qm Micc Ft Mccoy (Rc)$89K—
Feb 2025Ae Services - Modification To Design For Wastewater Treatment Plant And Engineering During Construction Of Collection Lagoon On Boise-Forte ReservationW07v Endist St Paul$96K1
Sep 2024Project Number 08-3003cr, Charrette: Construct New Fire Station #3
Small Business Set Aside - Total
Fa4610 30 Cons Pk$339K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Seh - Tepa Es JV LLC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Seh - Tepa Es JV LLC? Request a correction.