ZukoBid.
Try it free
Federal contractor profile

Port Graham Development Corporation

Palmer, AK · Not a small business
UEI NAHNHCECQLB8 · CAGE 3ZNJ2
Contracts won
21
since Jan 2024 · last Sep 2026
Total value
$4.8M
including options
Buying offices
2
government offices it sold to
Usual competition
3 offers
5% of its wins had one offer

Wins by fiscal year

FY2024
7 · $3.5M
FY2025
5 · $466K
FY2026
9 · $821K

Who it sells to

6973gh Franchise Acquisition Svcs
Federal Aviation Administration · 20 wins · $1.9M
Bureau Of Indian Affairs
Bureau Of Indian Affairs · 1 win · $3.0M

What it wins

Installation Of Equipment- Electrical And Electronic Equipment Components
PSC N059 · 20 wins · $1.9M
IT And Telecom - Network: Satellite Communications And Telecom Access Services
PSC DG11 · 1 win · $3.0M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Coopersville, Mi (Cpv) Arsr Which Includes A Full Power Systems Study Of The Facility. Jcn: 21000077
6973gh Franchise Acquisition Svcs · ends Feb 2027 · $104K
Iija Funded / Gck Arsr, Garden City Ks / Jcn: 21002954 \Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Garden City, Ks (Gck) Arsr Which Includes A Full Power Systems Study Of The
6973gh Franchise Acquisition Svcs · ends Mar 2027 · $101K
Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Allentown, Pa (Abe) Asr Which Includes A Full Power Systems Study Of The Facility. Jcn: 1703575
6973gh Franchise Acquisition Svcs · ends Jan 2027 · $90K
Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Cleveland, Oh (Clea) Asr Which Includes A Full Power Systems Study Of The Facility. Jcn: 21002951
6973gh Franchise Acquisition Svcs · ends Feb 2027 · $80K
This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Dansville, Ny (Dsv) Arsr. Jcn:21002667
6973gh Franchise Acquisition Svcs · ends Nov 2026 · $78K

Recent awards

DateWhatOfficeValueOffers
Sep 2026Iija Funded / Gck Arsr, Garden City Ks / Jcn: 21002954 \Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Garden City, Ks (Gck) Arsr Which Includes A Full Power Systems Study Of The6973gh Franchise Acquisition Svcs$101K4
Aug 2026Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Cleveland, Oh (Clea) Asr Which Includes A Full Power Systems Study Of The Facility. Jcn: 21002951
Small Business Set Aside - Total
6973gh Franchise Acquisition Svcs$80K3
Jul 2026Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Allentown, Pa (Abe) Asr Which Includes A Full Power Systems Study Of The Facility. Jcn: 17035756973gh Franchise Acquisition Svcs$90K3
May 2026This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Dansville, Ny (Dsv) Arsr. Jcn:210026676973gh Franchise Acquisition Svcs$78K4
Apr 2026Iija Funded. Ashburn, Ga (Qhn) Arsr Jcn:20008134\N\Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Ashburn, Ga (Qhn) Arsr.6973gh Franchise Acquisition Svcs$92K4
Mar 2026This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Coopersville, Mi (Cpv) Arsr Which Includes A Full Power Systems Study Of The Facility. Jcn: 210000776973gh Franchise Acquisition Svcs$104K5
Dec 2025Iija Funded. Kansas City, Mo (Mci) Atct\Njcn: 26000505\Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Kansas City, Mo (Mci) Atct Which Includes A Full Power Systems Study Of The6973gh Franchise Acquisition Svcs$80K2
Dec 2025Iija Funded. Slidell, La (Sil) Arsr\Njcn:26000506\Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Slidell, La (Sil) Arsr Which Includes A Full Power Systems Study Of The Facility.6973gh Franchise Acquisition Svcs$104K2
Dec 2025Iija Funded. Citronelle, Al (Qrb) Arsr Jcn:18066545 \Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Citronelle, Al (Qrb) Arsr Which Includes A Full Power Systems Study Of The Fac6973gh Franchise Acquisition Svcs$92K2
Sep 2025Iija Funded. Freeland, Mi (Mbs) Asr Jcn:18066401\Nthis Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Freeland, Mi (Mbs) Asr Which Includes A Full Power Systems Study Of The Facility.6973gh Franchise Acquisition Svcs$97K3
Jun 2025Iija Funded. Muskegon, Mi (Mkge) Asr Jcn: 22007976 This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Muskegon, Mi (Mkge) Asr, Which Includes A Full Power Systems Study Of The Facili6973gh Franchise Acquisition Svcs$94K4
Jun 2025Iija Funded. Rochester, Mn (Rstb) Asr Jcn: 24010113 This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Rochester, Mn (Rstb) Asr, Which Includes A Full Power Systems Study Of The Faci6973gh Franchise Acquisition Svcs$94K4
Jun 2025Iija Funded. Flint, Mi (Fnt) Asr Jcn: 19005396 This Unilateral Award Is For The Construction Cost Of The Ups And Ups Ancillary Equipment Removal And Installation At Flint, Mi (Fnt) Asr, Which Includes A Full Power Systems Study Of The Facility.6973gh Franchise Acquisition Svcs$93K4
Nov 2024Bil Funds. Construction Cost Of Ups And The Ups Ancillary Equipment Removal And Installation At The Gulfport, Ms (Gpt) Asr Per The Rfq-24-25 Bid Package. Jcn: 18066536 Includes Option #1 Full Arc Flash Hazard Analysis (Afha) Of The Facility.6973gh Franchise Acquisition Svcs$88K2
Sep 2024Bil Funds. Construction Cost Of Ups And The Ups Ancillary Equipment Removal And Installation At The Roswell, Nm (Row) Asr Per The Rfq-24-23 Bid Package. Jcn: 24010109 Includes Option #1 Full Arc Flash Hazard Analysis (Afha) Of The Facility.6973gh Franchise Acquisition Svcs$82K3
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Port Graham Development Corporation? Request a correction.