ZukoBid.
Try it free
Federal contractor profile

North Star Construction And Engineering, INC.

Yuba City, CA · Not a small business · Part of North Star Construction & Engineering INC
UEI L11VBF8Y3AJ8 · CAGE 3XBA7
Contracts won
19
since Feb 2024 · last Aug 2026
Total value
$20M
including options
Buying offices
6
government offices it sold to
Usual competition
3 offers
11% of its wins had one offer

Wins by fiscal year

FY2024
4 · $3.7M
FY2025
11 · $11M
FY2026
4 · $5.5M

Who it sells to

Fa4686 9 Cons Pk
Dept Of The Air Force · 13 wins · $9.8M
Fws, Construction A/E Team 3
U.S. Fish And Wildlife Service · 2 wins · $3.2M
Doi, Nps Conops Strategic
National Park Service · 1 win · $4.6M
Fa4427 60 Cons Lgc
Dept Of The Air Force · 1 win · $1.7M
Pwr Goga(86000)
National Park Service · 1 win · $321K
Mp-Regional Office
Bureau Of Reclamation · 1 win · $84K

What it wins

Construction Of Office Buildings
PSC Y1AA · 4 wins · $7.9M
Repair Or Alteration Of Restoration Of Real Property (Public Or Private)
PSC Z2QA · 3 wins · $1.3M
Maintenance Of Airport Runways And Taxiways
PSC Z1BD · 2 wins · $2.9M
Maintenance Of Other Utilities
PSC Z1NZ · 2 wins · $420K
Maintenance Of Sewage And Waste Facilities
PSC Z1ND · 1 win · $3.5M
Repair Or Alteration Of Waste Treatment And Storage Facilities
PSC Z2PD · 1 win · $1.2M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Seki: Rehab Clover Creek Wastewater Disp
Doi, Nps Conops Strategic · ends Jul 2027 · $4.6M
Construction: Repair Primary Clarifier At The Waste Water Treatment Plant In Accordance With Statement Of Work And Design.
Fa4686 9 Cons Pk · ends Nov 2026 · $3.5M
10 Inch Water Main
Fa4686 9 Cons Pk · ends Dec 2026 · $628K

Recent awards

DateWhatOfficeValueOffers
Aug 2026Seki: Rehab Clover Creek Wastewater DispDoi, Nps Conops Strategic$4.6M4
Apr 202610 Inch Water MainFa4686 9 Cons Pk$628K4
Apr 2026This Project Is Located On Beale Air Force Base, Ca, At Various Locations In The Housing Area. Contractors Shall Perform All Work Involved To Reduce Inflow And Infiltration Into The Sewer Collection System.Fa4686 9 Cons Pk$129K1
Mar 2026Ca-Stone Lakes Nwr-Pump Repair
Small Business Set Aside - Total
Fws, Construction A/E Team 3$75K5
Sep 2025Construction: C Street Milling And Overlay ProjectFa4686 9 Cons Pk$508K4
Sep 2025Construction: Sealing And Striping Of Five Parking Lots.Fa4686 9 Cons Pk$734K3
Sep 2025Removal And Disposal Of Existing 2ea. Exterior Evaporative Coolers, Followed By Installation Of New Trane 20ton Package Unit, In Accordance With The Attached Statement Of Work, 240029 - Sow - B5768 Evap Cooler Replacement.
Small Business Set Aside - Total
Fa4686 9 Cons Pk$306K3
Aug 2025Remove And Replace Seven Ballistic Guard Booth Windows At The Folsom Dam
Small Business Set Aside - Total
Mp-Regional Office$84K2
Jul 2025Construction Gc Matoc Task Order. The Requirement Is For The Removal And Replacement Of Eleven (11) Evaporative Coolers, And The Replacement Of All Ceiling Fluorescent Style Lights With Led For Building 1023.Fa4686 9 Cons Pk$356K4
Jul 2025Construction: Rehabilitation Of The Sodium Hypo-Chlorite Generation System As Described In Specification 01 11 00, Paragraph 1.2.1.8 And Shown Within The Contract Documents Attached To This Solicitation.Fa4686 9 Cons Pk$1.2M1
May 2025Construction: Repair Primary Clarifier At The Waste Water Treatment Plant In Accordance With Statement Of Work And Design.Fa4686 9 Cons Pk$3.5M3
May 2025Construction: Remove And Replace Existing Hvac Unit As Well As Corresponding Electrical Panel, Fire Smoke Detectors, And Roof Installation, In Accordance With The Statement Of Need Dated 17 Mar 2025.Fa4686 9 Cons Pk$338K4
Apr 2025Construction: Upgrade Fire Pump Controllers At B11600, Design And Construction Of A New Fire Alarm System And Fire Pump Controllers. Project Also Includes Installation Of A Ductless Split System Air Conditioner With Programmable Thermostat.Fa4686 9 Cons Pk$634K5
Feb 2025Construction: Project Title: Fy25 Airfield Work\Nproject Location: Beale AFB, CaFa4686 9 Cons Pk$1.2M6
Jan 2025The Contractor (Ktr) Shall Provide All Professional Services, Permits, Equipment, Labor, Tools, Materials, And Ancillary Items To Complete The Tasks To Restripe 500 Ramp Area And Nearby Taxiways In Accordance With The Statement Of Work.
Small Business Set Aside - Total
Fa4427 60 Cons Lgc$1.7M4
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about North Star Construction And Engineering, INC.? Request a correction.