ZukoBid.
Try it free
Federal contractor profile

Acu Construction LLC

Carrollton, TX · Not a small business
UEI JB9LEDWB9MN9 · CAGE 7DW33
Contracts won
8
since Jan 2024 · last Sep 2025
Total value
$6.6M
including options
Buying offices
3
government offices it sold to
Usual competition
1 offer
100% of its wins had one offer

Wins by fiscal year

FY2024
4 · $5.0M
FY2025
4 · $1.6M

Who it sells to

W076 Endist Tulsa
Dept Of The Army · 3 wins · $4.9M
W076 Endist Ft Worth
Dept Of The Army · 3 wins · $532K
Office Of The Chief Procurement Officer
Bureau Of Engraving And Printing · 2 wins · $1.1M

What it wins

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
PSC Z2LB · 4 wins · $1.9M
Repair Or Alteration Of Production Buildings
PSC Z2EC · 2 wins · $1.1M
Construction Of Highways, Roads, Streets, Bridges, And Railways
PSC Y1LB · 1 win · $3.4M
Repair Or Alteration Of Miscellaneous Buildings
PSC Z2JZ · 1 win · $146K

Recent awards

DateWhatOfficeValueOffers
Sep 2025Road Repairs At Twin Bridges Park, Airport Park, And Reynolds Creek Park, Waco Lake.
8(A) Sole Source
W076 Endist Ft Worth$251K1
Sep 2025Replace Failed Culvert Pipe In Liberty Hill Park.
8(A) Sole Source
W076 Endist Ft Worth$135K1
Sep 2025Building Erection: Construct A Pre-Engineered, Three-Sided, Single Sloped Equipment Cover At Navarro Mills Project Office. Construction Of Concrete Foundation Slab To Foundation Design Drawings In Accordance With Summary Of Work.
8(A) Sole Source
W076 Endist Ft Worth$146K1
Jul 2025Asphalt Road Work At Keystone Lake, Oklahoma
8(A) Sole Source
W076 Endist Tulsa$1.1M1
Sep 2024W912bv24c0022: Contract Award For Road Repairs At Kaw Lake (Osage Cove And Sarge Creek) Public Use Areas, Oklahoma.
8(A) Sole Source
W076 Endist Tulsa$3.4M1
Apr 2024Oklahoma Eastern Area Erfo Located At Eufaula Lake, Fort Gibson Lake, And Tenkiller Lake, Oklahoma
8(A) Sole Source
W076 Endist Tulsa$408K1
Mar 2024Federal Reserve Vault Fire Detection Upgrade
8(A) Sole Source
Office Of The Chief Procurement Officer$484K1
Jan 2024Design And Installation Of All Site Prep Requirements In The New West Production Area For Installation Of A New Non-Sequential Large Examination Printing Equipment Press 5 At Western Currency Facility.
8(A) Sole Source
Office Of The Chief Procurement Officer$636K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Acu Construction LLC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Acu Construction LLC? Request a correction.