ZukoBid.
Try it free
Federal contractor profile

Adc Engineering INC

Hanahan, SC · Not a small business
UEI J8FFZNA58LC3 · CAGE 07DT0
Contracts won
22
since Nov 2023 · last Jul 2026
Total value
$10M
including options
Buying offices
5
government offices it sold to
Usual competition
1 offer
95% of its wins had one offer

Wins by fiscal year

FY2024
14 · $7.2M
FY2025
6 · $2.7M
FY2026
2 · $242K

Who it sells to

Fa4418 628 Cons Pk
Dept Of The Air Force · 16 wins · $6.5M
W071 Endist Omaha
Dept Of The Army · 3 wins · $1.6M
Fa8903 772 Ess Pk
Dept Of The Air Force · 1 win · $1.9M
W7m7 Uspfo Activity Inang 181
Dept Of The Army · 1 win · $219K
Base Charleston
U.S. Coast Guard · 1 win · $23K

What it wins

Repair Or Alteration Of Airport Runways And Taxiways
PSC Z2BD · 6 wins · $1.9M
Architect And Engineering- General: Other
PSC C219 · 3 wins · $1.6M
Architect And Engineering- General: Landscaping, Interior Layout, And Designing
PSC C211 · 2 wins · $1.9M
Repair Or Alteration Of Troop Housing Facilities
PSC Z2FC · 2 wins · $1.3M
Repair Or Alteration Of Office Buildings
PSC Z2AA · 2 wins · $1.1M
Repair Or Alteration Of Sewage And Waste Facilities
PSC Z2ND · 2 wins · $374K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Architect-Engineer (Ae) Is To Provide Investigative, Design, And Construction Inspection Services. Consists Of Removing And Replacing Approximately 6, 500 Lf Of Overhead High Voltage Lines And Installing Service Underground At Jefferson Proving Ground
W7m7 Uspfo Activity Inang 181 · ends Jul 2027 · $219K

Recent awards

DateWhatOfficeValueOffers
Jul 2026Architect-Engineer (Ae) Is To Provide Investigative, Design, And Construction Inspection Services. Consists Of Removing And Replacing Approximately 6, 500 Lf Of Overhead High Voltage Lines And Installing Service Underground At Jefferson Proving GroundW7m7 Uspfo Activity Inang 181$219K1
May 2026Uscg Base Charleston Rice Mill Building Envelope
Small Business Set Aside - Total
Base Charleston$23K12
Sep 2025Performance Of Title Ii Construction Inspection Services (Ci) And Title Ii Quality Assurance Services (Qa) For Dorm Renovation Project At Joint Base Charleston, Sc.Fa4418 628 Cons Pk$451K1
Aug 2025Usar Paver
Small Business Set Aside - Total
W071 Endist Omaha$957K1
Aug 2025A/E Services To Provide Feasibility Studies, Complete And Detailed Drawings, Specifications, Cost Estimate, And Other Project Design Documents Necessary For Repair Mission Planning Cell, Spec Ops Facility Bldg 162, At Joint Base Charleston, Sc.Fa4418 628 Cons Pk$687K1
Aug 2025The A/E Shall Furnish Qualified Personnel, Materials, Drawings, Specifications, And Cost Estimates For Project Repair Imc Pavements - Area H/J/K In Accordance With Statement Of Work Dated 22 Jul 20 And Design Work Order Dated 30 Apr 25.
Small Business Set Aside - Total
Fa4418 628 Cons Pk$185K1
Jun 2025The A/E Shall Furnish The Personnel, Services, Equipment, Materials, Facilities, Or Incidental To, The Performance Of Work For Title Ii Construction Inspection Services (Ci) And Title Ii Quality Assurance Services (Qa) For The Ramp Repair Project.
Small Business Set Aside - Total
Fa4418 628 Cons Pk$179K1
Jun 2025Dkfx 091009f -Repair Imc Area F Pavement, Title Ii Services
Small Business Set Aside - Total
Fa4418 628 Cons Pk$282K1
Sep 2024Electrical Condition Assmt, Libby Aaf AzW071 Endist Omaha$481K1
Sep 2024The A/E Shall Provide Complete And Detailed Drawings, Specifications, A Cost Estimate, And Other Project Design Documents Necessary For The Project To Construct Cargo Pad Laydown Area At Joint Base Charleston - Air Base.Fa4418 628 Cons Pk$139K1
Sep 2024The A/E Shall Furnish Qualified Personnel To Design The Repair/Replacement Method For The Pavement Section Between Runway 03-21 And 15-33 To Include All Airfield Lighting And Marking While Keeping The Joint Airfield Operations Impact Minimalized.Fa4418 628 Cons Pk$936K1
Aug 2024The Contractor Shall Provide Architect-Engineer (A/E) Services To Provide Complete/Detailed Drawings, Specs, Cost Estimate, And Other Project Design Documents Necessary For Dkfx 1051445 Repair Maintenance Dock, B.550, At Jb Charleston Ab, Sc.Fa4418 628 Cons Pk$214K1
Jun 2024The A/E Shall Furnish Qualified Personnel To Design Various Projects At Joint Base Charleston And Its Outlying Properties In Strict Accordance With Appendix A Statement Of Work Dated 22 July 2020 And Individual Project Design Work Orders.Fa4418 628 Cons Pk$192K1
May 2024The Work Will Be Iaw The Sow Date 27 Oct 2023, Pool 1 Airfield Infrastructure Title 2 Ae Svcs For Design-Build Cons Of Repair 400 Acft Parking Ramp - Phase 4 At Travis AFB Pjct # Xdat06100104, In Att 1, Listed In Sect J & Stated In Sect B Of This To.Fa8903 772 Ess Pk$1.9M1
May 2024Provide Complete And Detailed Drawings, Specifications, Construction Cost Estimate, Design Schedule, And Other Supporting Analyses And Documents Necessary To Repair Dormitory, B. 464 At Joint Base Charleston (Ab), Sc. Iaw Dwo Dated 1 Dec 23Fa4418 628 Cons Pk$819K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Adc Engineering INC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Adc Engineering INC? Request a correction.