ZukoBid.
Try it free
Federal contractor profile

Verdis Takisaki Ii

Coeur D Alene, ID · Small business
UEI HWN2APWU4NF7 · CAGE 99NR1
Contracts won
12
since May 2024 · last Jul 2026
Total value
$6.8M
including options
Buying offices
1
government offices it sold to
Usual competition
4 offers
0% of its wins had one offer

Wins by fiscal year

FY2024
4 · $2.8M
FY2025
4 · $2.0M
FY2026
4 · $2.0M

Who it sells to

Fa4620 92 Cons Lgc
Dept Of The Air Force · 12 wins · $6.8M

What it wins

Repair Or Alteration Of Miscellaneous Buildings
PSC Z2JZ · 12 wins · $6.8M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
All Labor, Materials And Equipment Necessary To Perform Repair Dorm Skylights Including But Not Limited To The Design, Material Submittal Process Hazardous Materials Survey Demolition, Replacement And Construction Associated With The Project.
Fa4620 92 Cons Lgc · ends Mar 2027 · $582K
35% Design, Install Automated Identification Scanning System Complete To Provide A Complete Automated Identification Base Access System At The Main Entry Control Facility At Fairchild AFB.
Fa4620 92 Cons Lgc · ends Jul 2027 · $242K
Gjkz1160115 Repair Fiber Optic Entries
Fa4620 92 Cons Lgc · ends Jul 2027 · $220K

Recent awards

DateWhatOfficeValueOffers
Jul 2026Gjkz1160115 Repair Fiber Optic EntriesFa4620 92 Cons Lgc$220K3
Mar 2026All Labor, Materials And Equipment Necessary To Perform Repair Dorm Skylights Including But Not Limited To The Design, Material Submittal Process Hazardous Materials Survey Demolition, Replacement And Construction Associated With The Project.Fa4620 92 Cons Lgc$582K4
Dec 2025Design Services Consisting Of 65% Design (15% Government Concept Design Is Provided) Work And All Testing And Inspection For Repair For Building 2465 To Meet The Requirements Of The Attached Statement Of Work.Fa4620 92 Cons Lgc$547K4
Dec 2025This Is A 35% Design Build, Defined As A Specific Work Element No. 2 (Design-Build Effort Required With Provided Partial Design) Proposed Task Order As Specified In The Basic Matoc Contract Requirements, Section 01000, Paragraph 1.2.Fa4620 92 Cons Lgc$644K4
Sep 2025Install Water Main Utility Vaults At Insertion Tap Locations And Provide A Condition Study And Report For The Watermain Piping From The Geiger Water Facility To The Extraction Point.Fa4620 92 Cons Lgc$827K5
Aug 2025Remove Existing Electric Fire Pump And Associated Fire Pump Infrastructure, Install Post Indicator Valve On Fire Water Main And Include Tamper Switch; Modify Emcs To Reflect Fire Pump System Control Changes; Acm AbatementFa4620 92 Cons Lgc$248K4
Jul 202535% Design, Install Automated Identification Scanning System Complete To Provide A Complete Automated Identification Base Access System At The Main Entry Control Facility At Fairchild AFB.Fa4620 92 Cons Lgc$242K3
Nov 2024See Section CFa4620 92 Cons Lgc$694K4
Sep 2024See Section C.Fa4620 92 Cons Lgc$632K5
Sep 2024See Section CFa4620 92 Cons Lgc$1.1M4
May 2024Fa462024f0060 - Repair Mechanical Room And Boiler, B1255Fa4620 92 Cons Lgc$488K2
May 2024See Section CFa4620 92 Cons Lgc$602K5
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Verdis Takisaki Ii →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Verdis Takisaki Ii? Request a correction.