ZukoBid.
Try it free
Federal contractor profile

Vedant Construction INC

Dracut, MA · Not a small business
UEI GGJ7YY2JQWU3 · CAGE 7MRT9
Contracts won
41
since Oct 2023 · last Aug 2026
Total value
$5.4M
including options
Buying offices
7
government offices it sold to
Usual competition
6 offers
0% of its wins had one offer

Wins by fiscal year

FY2024
19 · $2.5M
FY2025
14 · $1.7M
FY2026
8 · $1.1M

Who it sells to

Fa2835 Aflcmc Hanscom Pzi
Dept Of The Air Force · 28 wins · $3.7M
W2sd Endist New England
Dept Of The Army · 7 wins · $619K
W6qk Acc-Ri-Picatinny
Dept Of The Army · 2 wins · $291K
Ner Services Mabo (43000)
National Park Service · 1 win · $649K
Support Services Section(Ss40)
Federal Emergency Management Agency · 1 win · $25K
Usda-Fs, Csa East 13
Forest Service · 1 win · $23K

What it wins

Repair Or Alteration Of Miscellaneous Buildings
PSC Z2JZ · 18 wins · $1.5M
Repair Or Alteration Of Restoration Of Real Property (Public Or Private)
PSC Z2QA · 10 wins · $2.2M
Construction Of Restoration Of Real Property (Public Or Private)
PSC Y1QA · 3 wins · $227K
Maintenance Of Office Buildings
PSC Z1AA · 2 wins · $291K
Construction Of Miscellaneous Buildings
PSC Y1JZ · 2 wins · $269K
Construction Of Highways, Roads, Streets, Bridges, And Railways
PSC Y1LB · 2 wins · $112K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Lowell National Historical Park - Replace Cooling Tower 1 And Pumps
Ner Services Mabo (43000) · ends Aug 2027 · $649K
Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, Nh
W2sd Endist New England · ends Feb 2027 · $52K

Recent awards

DateWhatOfficeValueOffers
Aug 2026Lowell National Historical Park - Replace Cooling Tower 1 And Pumps
Small Business Set Aside - Total
Ner Services Mabo (43000)$649K6
Jul 2026Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, Nh
Small Business Set Aside - Total
W2sd Endist New England$52K3
Apr 2026Repair (Sustain) Allied Support To Central Plant Shut Down, Spring 2026, Hanscom AFBFa2835 Aflcmc Hanscom Pzi$174K—
Mar 2026In Accordance With The Statement Of Work (Sow) Dated 12 January 2026, This Project Is Intended To Install Handicap Door Openers On Both Building Entrance Doors, Interior Foyer Doors And Male And Female Restroom Doors.Fa2835 Aflcmc Hanscom Pzi$69K5
Mar 2026Mold Remediation Services, Colebrook River Lake, Colebrook, Ct
Small Business Set Aside - Total
W2sd Endist New England$34K7
Jan 2026Removal Of The Existing Carpeting System, Replacement Of Approximately 128 Square Feet Of Damaged Subfloor Sheathing, And Installation Of Approximately 1700 Square Feet Of New Carpet Tiles In The Conference Room Of The Lab Pierce Building At Hubbard
Small Business Set Aside - Total
Usda-Fs, Csa East 13$23K10
Jan 2026In Accordance With The Statement Of Work (Sow) Dated 13 June 2025, This Project Is Intended To Install Handicap Door Openers On Both Building Entrance Doors, Interior Foyer Doors And Male And Female Restroom Doors.Fa2835 Aflcmc Hanscom Pzi$54K4
Jan 2026Pavement Crack Repair, Seal Coating And Line Striping, Buffumville Lake, Charlton, Ma And Hodges Village Dam, Oxford, Ma
Small Business Set Aside - Total
W2sd Endist New England$59K25
Sep 2025In Accordance With The Statement Of Work (Sow) Dated 2 June 2025, This Project Is Intended To Install Insulation On Hot And Cold-Water Pipes.Fa2835 Aflcmc Hanscom Pzi$32K6
Sep 2025In Accordance With The Statement Of Work (Sow) Dated 02 April 2025, This Projects Intent Is To Add A Door Entrance And Exterior Stairs To The Court.Fa2835 Aflcmc Hanscom Pzi$81K6
Sep 2025Replace Doors And Windows Of Railroad Bridge Generator Building, Cape Cod Canal, Bourne, Ma
Small Business Set Aside - Total
W2sd Endist New England$69K6
Sep 2025In Accordance With The Statement Of Work (Sow) Dated 19 March 2025, This Project Is Intended To Prepare And Paint All Walls And Ceilings, Remove And Install New Carpet Tile And Wall Base Molding In Suite 111.Fa2835 Aflcmc Hanscom Pzi$69K7
Sep 2025In Accordance With The Statement Of Work (Sow) Dated 19 March 2025, This Project Is Intended To Paint The Walls And Ceilings And Install New Carpet Tiling And Wall Base Molding In Suite 207.Fa2835 Aflcmc Hanscom Pzi$69K7
Sep 2025The Purpose Of This Action Is To Obligate Funding In Support Of The Bi-Annual Central Plant Maintenace.Fa2835 Aflcmc Hanscom Pzi$141K—
Sep 2025The Department Of Homeland Security (Dhs) Federal Emergency Management Agency (Fema) Has A Requirement For Epoxy Flooring Repair And Installation At Its Maynard, Ma Mobile Emergency Response Support (Mers) Vehicle Storage And Administration Building.
Small Business Set Aside - Total
Support Services Section(Ss40)$25K3
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Vedant Construction INC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Vedant Construction INC? Request a correction.