ZukoBid.
Try it free
Federal contractor profile

Qa Engineering LLC

Albuquerque, NM · Not a small business
UEI F7KGDBKE9Q22 · CAGE 72KC9
Contracts won
29
since Jun 2024 · last Sep 2026
Total value
$47M
including options
Buying offices
9
government offices it sold to
Usual competition
1 offer
56% of its wins had one offer

Wins by fiscal year

FY2024
12 · $35M
FY2025
7 · $1.3M
FY2026
10 · $11M

Who it sells to

Fa9401 377 Msg Pk
Dept Of The Air Force · 7 wins · $12M
W075 Endist Albuquerque
Dept Of The Army · 6 wins · $27M
Indian Education Acquisition Office
Bureau Of Indian Affairs · 3 wins · $948K
W7nq Uspfo Activity Nmang 150
Dept Of The Army · 3 wins · $897K
Albuquerque Area Indian Health Svc
Indian Health Service · 3 wins · $177K
Nnsa Non-Mo Cntrctng Ops Div
Energy, Department Of · 2 wins · $3.4M

What it wins

Repair Or Alteration Of Office Buildings
PSC Z2AA · 5 wins · $5.3M
Construction Of Other Administrative Facilities And Service Buildings
PSC Y1AZ · 4 wins · $10M
Maint/Repair/Rebuild Of Equipment- Plumbing, Heating, And Waste Disposal Equipment
PSC J045 · 3 wins · $3.3M
Installation Of Equipment- Electrical And Electronic Equipment Components
PSC N059 · 3 wins · $2.3M
Construction Of Miscellaneous Buildings
PSC Y1JZ · 2 wins · $17M
Installation Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
PSC N041 · 2 wins · $547K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
The Primary Purpose And Objective Of This Project Is To Replace The Existing 1600a Switchboard Breakers With New, Like-For-Like Draw-Out Style Breakers.
Fa9401 377 Msg Pk · ends Apr 2027 · $1.5M
The Contractor Shall Provide All Labor, Materials, Equipment, Supervision, And Project Management Necessary To Install And Modify Electrical Infrastructure Supporting The Deployment Of Audio/Visual (A/V) And Secure Video Teleconferencing (Svtc) Syste
Ibc Acq Svcs Directorate (00004) · ends Nov 2026 · $387K
Fy26 - 1047 Boiler Replacement. Anticipated Issuance Of Ntp Is August 3, 2026anticipated Start Date Is August 13, 2026 (10 Calendar Days After Issuance Of Ntp) Anticipated Completion Date Is February 9, 2027 (180 Calendar Days After The Start Date)
W7nq Uspfo Activity Nmang 150 · ends Feb 2027 · $261K
Building 497 Repair Suites 125a-F, 277 And 419 At Kirtland AFB, Nm
W075 Endist Albuquerque · ends Jan 2027 · $229K
Building 323 Construct Breakroom, Kirtland Air Force Base, New Mexico
W075 Endist Albuquerque · ends Jan 2027 · $111K

Recent awards

DateWhatOfficeValueOffers
Sep 2026Design/Build Construction To Renovate An Existing Limited Area Within The John A. Gordon Complex And Convert IT Into A Secure SpaceNnsa Non-Mo Cntrctng Ops Div$3.0M—
Sep 2026Design/Build Construction To Install Door Wind Block Structures At The John A. Gordon ComplexNnsa Non-Mo Cntrctng Ops Div$419K—
Jul 2026The Contractor Shall Provide All Labor, Materials, Equipment, Supervision, And Project Management Necessary To Install And Modify Electrical Infrastructure Supporting The Deployment Of Audio/Visual (A/V) And Secure Video Teleconferencing (Svtc) Syste
8(A) Sole Source
Ibc Acq Svcs Directorate (00004)$387K1
Jul 2026Building 323 Construct Breakroom, Kirtland Air Force Base, New Mexico
8(A) Sole Source
W075 Endist Albuquerque$111K1
Jul 2026Building 497 Repair Suites 125a-F, 277 And 419 At Kirtland AFB, Nm
8(A) Sole Source
W075 Endist Albuquerque$229K1
Jul 2026Fy26 - 1047 Boiler Replacement. Anticipated Issuance Of Ntp Is August 3, 2026anticipated Start Date Is August 13, 2026 (10 Calendar Days After Issuance Of Ntp) Anticipated Completion Date Is February 9, 2027 (180 Calendar Days After The Start Date)
Small Business Set Aside - Total
W7nq Uspfo Activity Nmang 150$261K4
May 2026Modifying South High Bay In Building 948 To Accommodate The Weapons System Trainer (Wst) #2.Fa9401 377 Msg Pk$329K1
Apr 2026D/B Repair Building 322 Cerebro Laboratory, Kirtland Air Force Base, Bernalillo County, New Mexico
8a Competed
W075 Endist Albuquerque$4.3M13
Apr 2026Name Brand Water Fountain Replacement And Installation At Santa Fe Indian Health Center.Albuquerque Area Indian Health Svc$58K4
Feb 2026The Primary Purpose And Objective Of This Project Is To Replace The Existing 1600a Switchboard Breakers With New, Like-For-Like Draw-Out Style Breakers.Fa9401 377 Msg Pk$1.5M1
Sep 2025Dtra Dafb Restroom Remodel Bldg 20754
8(A) Sole Source
Ibc Acq Svcs Directorate (00004)$89K1
Sep 2025Emergecny Cooling Tower RentalIndian Education Acquisition Office$276K1
Sep 2025Water Heater Replacement - NsrtcAlbuquerque Area Indian Health Svc$45K1
Jul 2025Building 20140 Fiber Optic Installation, Kirtland AFB, Nm
8(A) Sole Source
Fa2548 Spc Rpd Cpblts Offc Spc Rco$383K1
May 2025Ssc Requires The Installation Of 3 Blower Coils To Provide Cooling To 3 Office Space Rooms. All Materials To Include Piping, From Main Chilled Water Lines In The Mechanical Room, And Duct Work From Blower Coils To The Rooms Will Need To Be Installed.
Small Business Set Aside - Total
Fa9401 377 Msg Pk$286K2
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Qa Engineering LLC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Qa Engineering LLC? Request a correction.