ZukoBid.
Try it free
Federal contractor profile

Thompson Contracting, INC.

Libby, MT · Not a small business · Part of Thompson Contracting INC
UEI EX6HJMAZJYL5 · CAGE 1WRU9
Contracts won
25
since Jan 2024 · last Aug 2026
Total value
$71M
including options
Buying offices
6
government offices it sold to
Usual competition
2 offers
36% of its wins had one offer

Wins by fiscal year

FY2024
12 · $7.1M
FY2025
4 · $60M
FY2026
9 · $3.2M

Who it sells to

Usda-Fs, Csa Intermountain 9
Forest Service · 15 wins · $8.7M
Usda Forest Service-Spoc Im
Forest Service · 3 wins · $1.8M
W071 Endist Seattle
Dept Of The Army · 3 wins · $223K
Usda-Fs Pps Incident Procurement
Forest Service · 2 wins · $53K
690567 Western Federal Lands Div
Federal Highway Administration · 1 win · $60M
Usda-Fs, Csa Intermountain 1
Forest Service · 1 win · $11K

What it wins

Maintenance Of Highways/Roads/Streets/Bridges/Railways
PSC Z1LB · 8 wins · $6.4M
Construction Of Highways, Roads, Streets, Bridges, And Railways
PSC Y1LB · 6 wins · $61M
Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
PSC Z2LB · 2 wins · $538K
Lease Or Rental Of Equipment- Materials Handling Equipment
PSC W039 · 2 wins · $56K
Natural Resources/Conservation- Forest-Range Fire Suppression/Presuppression
PSC F003 · 2 wins · $53K
Maintenance Of Recreation Facilities (Non-Building)
PSC Z1PA · 1 win · $1.6M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Gaoa Timberlane Campground Reconstruction \Ntask Order\Napplicable Contract, R1 Road And Bridge Matoc Awardee List Or Other\Na. The Intent Of The Contract Is To Provide For The Complete Construction Of The Project\Nas Described In The Contract. T
Usda-Fs, Csa Intermountain 9 · ends Sep 2027 · $1.6M
Ramsey Creek And Lower Granite Bridges Were Damaged Beyond Repair By High Stream Flows During A Recent Storm Event. Temporary Bridge Installation Is Intended To Provide Needed Access For Mining And Private Inholdings.
Usda-Fs, Csa Intermountain 9 · ends Dec 2026 · $677K
Gaoa Fkl Day Use Area And Emery Bay Campground Improvement
Usda-Fs, Csa Intermountain 9 · ends Jun 2027 · $446K
Graves Creek Bridge Retaining Wall Repairs
Usda-Fs, Csa Intermountain 9 · ends Oct 2027 · $176K

Recent awards

DateWhatOfficeValueOffers
Aug 2026Graves Creek Bridge Retaining Wall RepairsUsda-Fs, Csa Intermountain 9$176K1
Jul 2026Telegraph Creek Bridge Repairs Consists Of Furnishing And Installing Reinforcements To 12 Timber Abutment Posts On The Telegraph Creek Bridge According To Regional Abutment Post Strengthening Detail 1908.Usda-Fs, Csa Intermountain 9$43K3
May 2026Ramsey Creek And Lower Granite Bridges Were Damaged Beyond Repair By High Stream Flows During A Recent Storm Event. Temporary Bridge Installation Is Intended To Provide Needed Access For Mining And Private Inholdings.Usda-Fs, Csa Intermountain 9$677K3
Mar 2026The Purpose Of This Requirement Is To Provide The Appropriate Assistance For Required Emergency Measures To Save Lives And To Protect Property And Public Health And Safety, Or To Lessen Or Avert The Threat Of A Catastrophe In The Designated Areas.
Small Business Set Aside - Total
W071 Endist Seattle$28K2
Mar 2026The Purpose Of This Requirement Is To Provide The Appropriate Assistance For Required Emergency Measures To Save Lives And To Protect Property And Public Health And Safety, Or To Lessen Or Avert The Threat Of A Catastrophe In The Designated Areas.
Small Business Set Aside - Total
W071 Endist Seattle$28K1
Mar 2026Gaoa Fkl Day Use Area And Emery Bay Campground ImprovementUsda-Fs, Csa Intermountain 9$446K6
Feb 2026The Purpose Of This Requirement Is To Provide The Appropriate Assistance For Required Emergency Measures To Save Lives And To Protect Property And Public Health And Safety, Or To Lessen Or Avert The Threat Of A Catastrophe In The Designated Areas.W071 Endist Seattle$167K1
Dec 2025This Project Will Complete The Road Work To Bring The Roads To Safe Haul Status For The Dead Post Timber Sale By Replacing Failing Culverts, Maintaining The Road, And Improving Drainage. Dead Post Timber Sale Is Critical For Both The Timber Target FUsda-Fs, Csa Intermountain 9$117K4
Nov 2025Gaoa Timberlane Campground Reconstruction \Ntask Order\Napplicable Contract, R1 Road And Bridge Matoc Awardee List Or Other\Na. The Intent Of The Contract Is To Provide For The Complete Construction Of The Project\Nas Described In The Contract. T
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 9$1.6M7
Sep 2025Thompson Contracting, INC.\Nmtknf000389\Ne2Usda-Fs Pps Incident Procurement$14K1
Sep 2025Thompson Contracting, INC.\Nidipf000798\Ne47Usda-Fs Pps Incident Procurement$39K1
Aug 2025Gaoa Rexford Bench Boat Ramp Asphalt Replacement Kootenai NfUsda-Fs, Csa Intermountain 9$362K4
Apr 2025Idaho, Montana, And Surrounding Areas Indefinite Delivery/ Indefinite Quantity (Idiq) Multiple Award Task Order Contract (Matoc)690567 Western Federal Lands Div$60M17
Sep 2024Prepare Roadway For Aggregate Placement And Place A 4 Aggregate Lift On A 14 Road Surface. The Contract Consists Of Blading And Hauling Commercial Source Minus Crush Surfacing With Binder And Placement Of Aggregate On Nfsr 3668 From Mile Post (Mp) 13Usda-Fs, Csa Intermountain 9$61K1
Sep 2024Gaoa Selway Area Road Projects Npcnf
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 9$887K2
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Thompson Contracting, INC. →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Thompson Contracting, INC.? Request a correction.