ZukoBid.
Try it free
Federal contractor profile

Ma-Chis C & C Contractors LLC

Elba, AL · Not a small business
UEI DQFLBNG3KC45 · CAGE 89VN7
Contracts won
9
since Sep 2024 · last Jun 2026
Total value
$23M
including options
Buying offices
1
government offices it sold to
Usual competition
—

Wins by fiscal year

FY2024
4 · $10M
FY2025
2 · $5.1M
FY2026
3 · $8.1M

Who it sells to

W074 Endist Savannah
Dept Of The Army · 9 wins · $23M

What it wins

Construction Of Miscellaneous Buildings
PSC Y1JZ · 4 wins · $6.8M
Repair Or Alteration Of Miscellaneous Buildings
PSC Z2JZ · 2 wins · $5.3M
Repair Or Alteration Of Religious Facilities
PSC Z2FE · 1 win · $6.2M
Repair Or Alteration Of Heating And Cooling Plants
PSC Z2NB · 1 win · $3.6M
Repair Or Alteration Of Office Buildings
PSC Z2AA · 1 win · $1.4M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Furnish All Labor, Material, Equipment, Incidentals, Supervision And Transportation For Work Necessary To Repair Hvac Bldg. 3245
W074 Endist Savannah · ends Dec 2026 · $3.6M
Furnish All Labor, Material, Equipment, Incidentals, Supervision, And Transportation For Work Necessary To Complete The Statement Of Work.
W074 Endist Savannah · ends Apr 2027 · $1.6M
Repair By Replacement The External Terracotta Volar Bldg 515 Damaged Sanitary Sewer Line. The Sewer Requires An Immediate Replacement Due To The Line Being Collapsed And Filled With Soil, Roots, Debris. Replace The Line With A New Pvc Line.
W074 Endist Savannah · ends Jan 2027 · $429K

Recent awards

DateWhatOfficeValueOffers
Jun 2026The Bicentennial Chapel Repair Includes Repairing Roofing Systems And Removing Damaged Interior Features. Options Include, But Are Not Limited To, Hvac, Ceilings, Storefront Doors, Glass Walls/Doors/Windows, Carpets, And Portions Of Interior Walls.W074 Endist Savannah$6.2M—
Mar 2026Repair By Replacement The External Terracotta Volar Bldg 515 Damaged Sanitary Sewer Line. The Sewer Requires An Immediate Replacement Due To The Line Being Collapsed And Filled With Soil, Roots, Debris. Replace The Line With A New Pvc Line.W074 Endist Savannah$429K—
Nov 2025The Work Associated With This Task Order Is Within The Scope Of The Basic Contract Because IT Is A Design-Build Contract To Renovate The 5th Floor Of Building 4-2843 Office Of Special Trial Counsel (Ostc) Located At Fort Bragg, Nc.W074 Endist Savannah$1.4M—
Sep 2025Furnish All Labor, Material, Equipment, Incidentals, Supervision And Transportation For Work Necessary To Repair Hvac Bldg. 3245W074 Endist Savannah$3.6M—
Sep 2025Furnish All Labor, Material, Equipment, Incidentals, Supervision, And Transportation For Work Necessary To Complete The Statement Of Work.W074 Endist Savannah$1.6M—
Sep 2024Construction - Bldg. 89 Envelope RepairW074 Endist Savannah$3.8M—
Sep 2024Schley Pond Dam Repair(S)W074 Endist Savannah$1.7M—
Sep 2024Base - Hvac Ft Moore GaW074 Endist Savannah$2.9M—
Sep 2024Base: Bldg. 4 Controls (S)W074 Endist Savannah$1.8M—
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Ma-Chis C & C Contractors LLC? Request a correction.