ZukoBid.
Try it free
Federal contractor profile

Liberty Electric INC

Missoula, MT · Not a small business
UEI DHMLQJL9Z533 · CAGE 0LYU7
Contracts won
16
since Feb 2024 · last Jun 2026
Total value
$2.4M
including options
Buying offices
4
government offices it sold to
Usual competition
2 offers
31% of its wins had one offer

Wins by fiscal year

FY2024
6 · $440K
FY2025
5 · $561K
FY2026
5 · $1.4M

Who it sells to

Nih A E Construction
National Institutes Of Health · 8 wins · $590K
Fa4626 341 Cons Lgc
Dept Of The Air Force · 5 wins · $850K
National Institutes Of Health Olao
National Institutes Of Health · 2 wins · $307K
Usda-Fs, Csa Intermountain 9
Forest Service · 1 win · $665K

What it wins

Repair Or Alteration Of Other Industrial Buildings
PSC Z2EZ · 8 wins · $768K
Installation Of Equipment- Electrical And Electronic Equipment Components
PSC N059 · 2 wins · $400K
Construction Of Recreational Buildings
PSC Y1FB · 1 win · $665K
Repair Or Alteration Of Other Utilities
PSC Z2NZ · 1 win · $384K
Repair Or Alteration Of Unimproved Real Property (Land)
PSC Z2PC · 1 win · $79K
Wallboard, Building Paper, And Thermal Insulation Materials
PSC 5640 · 1 win · $55K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Gaoa Lcic Lighting Upgrade (Re-Solicitation)
Usda-Fs, Csa Intermountain 9 · ends Apr 2027 · $665K
Removal And Replacement Of All Street Lights, Poles, And Concrete Bases, Including New Circuits, Conduits, Conductors, Disconnects On Pedestals, And Connections To Existing Transformers. Conduits Shall Be Installed By Directional Drilling.
Fa4626 341 Cons Lgc · ends Nov 2026 · $384K
Ups Electrical Work At Rml, Building 6
National Institutes Of Health Olao · ends Jun 2027 · $144K

Recent awards

DateWhatOfficeValueOffers
Jun 2026Ups Replacement - Riello Master Hp 250kva System, Bldg. 15 At RmlNational Institutes Of Health Olao$164K1
Jun 2026Ups Electrical Work At Rml, Building 6National Institutes Of Health Olao$144K1
Jun 2026Gaoa Lcic Lighting Upgrade (Re-Solicitation)
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 9$665K6
Apr 2026Lightning Protection
Small Business Set Aside - Total
Fa4626 341 Cons Lgc$55K9
Feb 2026Removal And Replacement Of All Street Lights, Poles, And Concrete Bases, Including New Circuits, Conduits, Conductors, Disconnects On Pedestals, And Connections To Existing Transformers. Conduits Shall Be Installed By Directional Drilling.
Small Business Set Aside - Total
Fa4626 341 Cons Lgc$384K9
Sep 2025Provide Funding For Electrical System Emergency Repairs In Support Of Research Facilities At The Rml Campus.Nih A E Construction$100K1
Jul 2025Wing Conference Room Conduit Install
Small Business Set Aside - Total
Fa4626 341 Cons Lgc$15K9
May 2025Provide 208v 3 Phase Power To The Lagoons At 11 Missile Alert Facilities. Installation Of Electrical Conduit, Conductors, Service Panels With Main Breakers, Circuit Breakers, And Outlets From Specified Locations To The Lagoons.
Small Business Set Aside - Total
Fa4626 341 Cons Lgc$386K2
Apr 2025This Purchase Is For The Acceptance Testing Of Lightning Protection System (Lps) For Building 1825 At Malmstrom AFB. The Acceptance Testing Will Include The Following Tasks Specified In The Sow.
Small Business Set Aside - Total
Fa4626 341 Cons Lgc$11K1
Nov 2024The Contractor Shall Provide All Items Necessary To Provide Electrical Repairs, Renovations, And Upgrades In Support Of The Nih/Rml Campus, Hamilton, Mt. (See The Schedule)
Small Business Set Aside - Total
Nih A E Construction$50K2
Sep 2024Orf Project No. C200615 The Contractor Shall Provide All Items Necessary To Provide Parking Lot Lighting In The New Temporary Nw Parking Lot. (See The Schedule)
Small Business Set Aside - Total
Nih A E Construction$79K2
Aug 2024The Contractor Shall Provide All Items Necessary To Provide, Install, Test And Commission Building 26 Boiler Plant Main Area Dimmable Lighting Control - Wired Option And Building 28 Chiller Plant Light Fixture Replacement At The Nih/Rml Campus, Hamil
Small Business Set Aside - Total
Nih A E Construction$24K2
Aug 2024Orf Project No.: C200377 The Contractor Shall Provide All Items Necessary To Provide Electrical Construction To Provide "Bldg. J Temporary Power For Construction" At The Nih/Rml Campus, Hamilton, Mt. (See The Schedule)
Small Business Set Aside - Total
Nih A E Construction$143K2
Jul 2024The Contractor Shall Provide All Items Necessary To Provide On Call Electrical Construction Renovations, Alterations And Repairs At The Nih/Rml Campus. (See The Schedule)
Small Business Set Aside - Total
Nih A E Construction$50K2
Apr 2024Construction, The Contractor Shall Provide All Items Necessary To Provide The Electrical Upgrades/Replacements In Bldg. 26, Boiler Plant At The Nin/Rml Campus, Hamilton, Mt. (See The Schedule)
Small Business Set Aside - Total
Nih A E Construction$19K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Liberty Electric INC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Liberty Electric INC? Request a correction.