Contracts won
7
since Apr 2024 · last Sep 2026
Total value
$22M
including options
Buying offices
2
government offices it sold to
Usual competition
3 offers
29% of its wins had one offer

Wins by fiscal year

FY2024
2 · $7.4M
FY2025
3 · $3.5M
FY2026
2 · $11M

Who it sells to

Western-Rocky Mountain Region
Energy, Department Of · 4 wins · $11M
Western-Upper Great Plains Region
Energy, Department Of · 3 wins · $11M

What it wins

Construction Of Other Non-Building Facilities
PSC Y1PZ · 5 wins · $15M
Construction Of Maintenance Buildings
PSC Y1EB · 1 win · $6.5M
Maint/Repair/Rebuild Of Equipment- Electric Wire And Power Distribution Equipment
PSC J061 · 1 win · $522K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Grand Island Substation, Stage 08 And Sioux Falls Substation, Stage 15, Station Serive Upgrades, Nebraska And South Dakota
Western-Upper Great Plains Region · ends May 2027 · $2.3M
Beresford Substation, Stage 11, South Dakota
Western-Upper Great Plains Region · ends Sep 2027 · $1.9M
North Cody Moi 954 Switch Replacement - Western Area Power Administration (Wapa) Rocky Mountain Region Has A Requirement With The Principlal Components Of Work To Include Replacing One (1) 115-Kv, 1200-Amp Motor-Operated Interrupter (Also Referred To
Western-Rocky Mountain Region · ends Sep 2027 · $522K

Recent awards

DateWhatOfficeValueOffers
Sep 2026The Stegall Substation Stage 07 Phase 01 Project To Replace End Of Life Equipment And Installs A New Control Building.
Small Business Set Aside - Total
Western-Rocky Mountain Region$8.8M3
Aug 2026Beresford Substation, Stage 11, South Dakota
Small Business Set Aside - Total
Western-Upper Great Plains Region$1.9M4
Sep 2025North Cody Moi 954 Switch Replacement - Western Area Power Administration (Wapa) Rocky Mountain Region Has A Requirement With The Principlal Components Of Work To Include Replacing One (1) 115-Kv, 1200-Amp Motor-Operated Interrupter (Also Referred ToWestern-Rocky Mountain Region$522K2
Sep 2025Grand Island Substation, Stage 08 And Sioux Falls Substation, Stage 15, Station Serive Upgrades, Nebraska And South Dakota
Small Business Set Aside - Total
Western-Upper Great Plains Region$2.3M1
Aug 2025Flatiron Substation 2025 Breaker Replacement With Principal Components Of Substation Work To Include Demolition And Site Development, Foundations And Platforms For Substation Electrical Equipment, Furnish And Install Galvanized Steel Structures, Inst
Small Business Set Aside - Total
Western-Rocky Mountain Region$599K8
Aug 2024Ault Substation Stage 10 To Replace 13.8kv Oil Reactors With Government Furnished Air Core Reactors, Replace Six Government Furnished 230kv Ccvts On Existing Structures, Replace Four 115kv Line Switches At Windsor Tap And Hygiene Tap On Existing Str
Small Business Set Aside - Total
Western-Rocky Mountain Region$933K1
Apr 2024Eagle Butte Substation, Stage 03, South Dakota
Small Business Set Aside - Total
Western-Upper Great Plains Region$6.5M4
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Addison Construction Co →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Addison Construction Co? Request a correction.