ZukoBid.
Try it free
Federal contractor profile

Fuller Construction Holding Company, INC

Chadron, NE · Not a small business · Part of Fuller Construction Holding Company INC
UEI CXURLJN8ERZ4 · CAGE 3ZGN3
Contracts won
7
since Mar 2025 · last Sep 2026
Total value
$1.8M
including options
Buying offices
4
government offices it sold to
Usual competition
8 offers
14% of its wins had one offer

Wins by fiscal year

FY2025
3 · $1.6M
FY2026
4 · $214K

Who it sells to

Mwr Nekota(63000)
National Park Service · 4 wins · $788K
Usda Forest Service-Spoc East
Forest Service · 1 win · $667K
Usda Forest Service-Spoc Im
Forest Service · 1 win · $279K
Usda-Fs, Csa Intermountain 8
Forest Service · 1 win · $41K

What it wins

Repair Or Alteration Of Other Residential Buildings
PSC Z2FZ · 1 win · $667K
Construction Of Other Administrative Facilities And Service Buildings
PSC Y1AZ · 1 win · $615K
Maint/Repair/Rebuild Of Equipment- Electric Wire And Power Distribution Equipment
PSC J061 · 1 win · $279K
Repair Or Alteration Of Family Housing Facilities
PSC Z2FA · 1 win · $79K
Repair Or Alteration Of Other Non-Building Facilities
PSC Z2PZ · 1 win · $59K
Maintenance Of Miscellaneous Buildings
PSC Z1JZ · 1 win · $41K

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
Eo 14398: This Award Is For Construction Services To Remove And Replace Windows/Doors Located At Jewel Cave National Monument.
Mwr Nekota(63000) · ends Jan 2027 · $79K

Recent awards

DateWhatOfficeValueOffers
Sep 2026Eo 14398: This Award Is For Construction Services To Remove And Replace Windows/Doors Located At Jewel Cave National Monument.
Hubzone Set-Aside
Mwr Nekota(63000)$79K8
Sep 2026This Project Consists Of The Removal Of The Asphalt Shingles On A Garage-Like Structure And Roofing Replacement With New Asphalt Roofing System Per Specifications. Also, The Removal And Replacement Of The Underlayment Per Specifications. The Removal
Small Business Set Aside - Total
Usda-Fs, Csa Intermountain 8$41K13
Jun 2026Eo 14398: This Request For Quotation Was For An Urgent And Compelling Requirement To Repair Jewel Cave National Monument Trail Head.
Small Business Set Aside - Total
Mwr Nekota(63000)$59K2
Apr 2026This Is An Urgent And Compelling Purchase Order For Construction Services To Repair A Roof At Wind Cave National Park.Mwr Nekota(63000)$35K1
Sep 2025Jewel Cave Nm Visitor Center Restroom Remodel And Airlock Door Hinges
Small Business Set Aside - Total
Mwr Nekota(63000)$615K8
Jun 2025The Project Involves The Rehabilitation Of Dorm Building 511 At The Pine Ridge Job Corps Civilian Conservation Center In Dawes County, Nebraska. The Work Includes Siding Replacement, Sheathing, Insulation, Flashing Installation, Roof Modifications, W
Small Business Set Aside - Total
Usda Forest Service-Spoc East$667K17
Mar 2025Gaoa Project - This Project Is To Remove The Existing Rv Pedestals And Associated Electrical System In The Group And Cedar Loop Campgrounds And Replace Them With New 50-Amp Pedestals. The New Electrical System Will Be From The Distribution Panel All
Small Business Set Aside - Total
Usda Forest Service-Spoc Im$279K13
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Fuller Construction Holding Company, INC? Request a correction.