ZukoBid.
Try it free
Federal contractor profile

Affiliated Engineers Metro Dc, INC.

Rockville, MD · Not a small business · Part of Affiliated Engineers Metro Dc INC.
UEI CNGMNCRF93X6 · CAGE 3UZT3
Contracts won
26
since Nov 2023 · last Sep 2026
Total value
$11M
including options
Buying offices
2
government offices it sold to
Usual competition
1 offer
92% of its wins had one offer

Wins by fiscal year

FY2024
15 · $6.9M
FY2025
3 · $921K
FY2026
8 · $3.1M

Who it sells to

Nih A E Construction
National Institutes Of Health · 23 wins · $10M
National Institutes Of Health Olao
National Institutes Of Health · 3 wins · $877K

What it wins

Architect And Engineering- General: Other
PSC C219 · 26 wins · $11M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
C201893: This Project Provides Updated Electrical Distribution Drawings, One-Line Diagrams, Butterfly Diagrams, Feeder Connectivity Documentation, Photographic And Video Records, And Condition Assessments Of All Visible Elements Inside The Manhole.
Nih A E Construction · ends Sep 2027 · $1.8M
C115777 - Nia/Ninds/Nei/Nhlbi/Nimhd Cafeteria Renovation Design.
Nih A E Construction · ends Dec 2026 · $1.1M
C201802 - Evaluate, Study, And Design A Robust, Long-Lasting Internal Liner System That Ensures Tank Integrity, Prevents Corrosion, Maintains Water Quality, And Complies With Regulatory Standards.
National Institutes Of Health Olao · ends Nov 2026 · $239K
Replacement For Req #742246 C201895 Nihac Historic Resources Survey, Poolesville, Cor - Nia Garner
Nih A E Construction · ends Jul 2027 · $157K
Pca-A&Econs-04089 This Project Consists Of Providing A Feasibility Study To Replace Fourteen (14) Ats In Crc Electrical Vaults Aa, Ab, Fa, And Ga That Provide Emergency Power Transfer For Critical Loads For Patient Care Units And Lab Wings That
National Institutes Of Health Olao · ends Dec 2026 · $156K

Recent awards

DateWhatOfficeValueOffers
Sep 2026C202421 - Power System Study For Iws And Tess.Nih A E Construction$62K1
Sep 2026C202047 - Cqm For Cup Chiller 28 & 29 Surveillance Cameras, Rtl, Mass Notification Devicesbldg 11, Wayne SmallsNih A E Construction$57K1
Sep 2026C201893: This Project Provides Updated Electrical Distribution Drawings, One-Line Diagrams, Butterfly Diagrams, Feeder Connectivity Documentation, Photographic And Video Records, And Condition Assessments Of All Visible Elements Inside The Manhole.Nih A E Construction$1.8M1
Sep 2026Replacement For Req #742246 C201895 Nihac Historic Resources Survey, Poolesville, Cor - Nia GarnerNih A E Construction$157K1
Sep 2026C201465 - Construction Quality Management (Cqm) Building 40 RoofNih A E Construction$84K1
Jun 2026Pca-A&Econs-04089 This Project Consists Of Providing A Feasibility Study To Replace Fourteen (14) Ats In Crc Electrical Vaults Aa, Ab, Fa, And Ga That Provide Emergency Power Transfer For Critical Loads For Patient Care Units And Lab Wings ThatNational Institutes Of Health Olao$156K1
Mar 2026C201802 - Evaluate, Study, And Design A Robust, Long-Lasting Internal Liner System That Ensures Tank Integrity, Prevents Corrosion, Maintains Water Quality, And Complies With Regulatory Standards.National Institutes Of Health Olao$239K1
Mar 2026C201851-Design Temporary T2 Transformer - Phase 1 - Vanessa Argote MaciaNational Institutes Of Health Olao$482K1
Jul 2025C106708 - Fy25 - Boiler Feedwater Pump Replacement -Commissioning, Cx Bldg 11, Wayne SmallsNih A E Construction$165K1
Jun 2025The Contract Action Is Essential To Ensure Construction Activities Continue To Progress And Remain Compliant With All Safety, Regulatory, And Functional Specifications To Ensure The Facility Complies With The Highest Industry Standards.Nih A E Construction$31K1
May 2025Provide A Design To Repair/Replace The Damaged Sanitary Main Underneath The Slab In The Basement Of Building 35a To Stop The Frequent Sewage Clogs And Back-Ups Impacting Vivarium Operations And Rendering The Basement Toilet Facilities UnusableNih A E Construction$725K1
Sep 2024Commissioning (Cx) Support Services For The Generators For Campus Emergency Chilled Water Service (C109584) Project At Central Utility Plant (Cup) At Nih, Research Triangle Park, NcNih A E Construction$371K13
Sep 2024C115968 - Commissioning Services For Irf Penthouse Mechanical Room Upgrade Breathing Air System, Fort DetrickNih A E Construction$83K1
Sep 2024C115933- Commissioning Services For 12e Cgmp Ups Power- Ashish Pandit- Period Of Performance 9/30/2024- 12/29/2025Nih A E Construction$63K1
Sep 2024C112224-External Review For Cup Bim Model Project \N\Ncs: Brad Arensodrf\Nco: Zach Price\Ncor: Wayne Smalls\Npo: Josh MillerNih A E Construction$46K1
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with them →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Affiliated Engineers Metro Dc, INC.? Request a correction.