ZukoBid.
Try it free
Federal contractor profile

Ams Industrial LLC

Lafayette, CO · Not a small business · Part of American Mine Services LLC
UEI CGPZMJ12XGK8 · CAGE 875R6
Contracts won
8
since Jun 2024 · last Aug 2026
Total value
$33M
including options
Buying offices
6
government offices it sold to
Usual competition
3.5 offers
0% of its wins had one offer

Wins by fiscal year

FY2024
2 · $5.1M
FY2025
3 · $19M
FY2026
3 · $9.4M

Who it sells to

W071 Endist Omaha
Dept Of The Army · 3 wins · $8.1M
W2sd Endist Baltimore
Dept Of The Army · 1 win · $9.1M
W071 Endist Portland
Dept Of The Army · 1 win · $8.4M
W076 Endist Tulsa
Dept Of The Army · 1 win · $3.6M
Mp-Regional Office
Bureau Of Reclamation · 1 win · $3.0M
W071 Endist Seattle
Dept Of The Army · 1 win · $1.1M

What it wins

Construction Of Dams
PSC Y1KA · 2 wins · $14M
Maintenance Of Dams
PSC Z1KA · 2 wins · $11M
Repair Or Alteration Of Dams
PSC Z2KA · 2 wins · $4.9M
Maint/Repair/Rebuild Of Equipment- Materials Handling Equipment
PSC J039 · 1 win · $1.5M
Construction Of Other Non-Building Facilities
PSC Y1PZ · 1 win · $1.1M

Ending in the next 12 months

Contracts that end soon are usually re-bid. These could be openings for a competitor.
All Work Required To Replace Valves
W2sd Endist Baltimore · ends Aug 2027 · $9.1M
Project Title: John Day Generator Water Cooling System Rehab\N\Nlocation: Sherman County, Oregon And Klickitat County, Washingtonmagnitude Of Construction: $5, 000, 000.00 To $10, 000, 000.00
W071 Endist Portland · ends Aug 2027 · $8.4M
This Project Will Replace Six Draft Tube Bulkheads, Consisting Of 12 Sheafs, Are Required. Dewatering Of A Unit Is Required For Annual Maintenance, Cavitation Repair, Contracted Work, And Periodic Inspections.
W071 Endist Omaha · ends Aug 2027 · $5.3M

Recent awards

DateWhatOfficeValueOffers
Aug 2026Eo 14398 - Friant Dam Gate Compressor System Replacement
Small Business Set Aside - Total
Mp-Regional Office$3.0M3
Dec 2025Repair Steel Liner
Small Business Set Aside - Total
W071 Endist Seattle$1.1M6
Nov 2025This Project Will Replace Six Draft Tube Bulkheads, Consisting Of 12 Sheafs, Are Required. Dewatering Of A Unit Is Required For Annual Maintenance, Cavitation Repair, Contracted Work, And Periodic Inspections.
Small Business Set Aside - Total
W071 Endist Omaha$5.3M7
Sep 2025All Work Required To Replace Valves
Small Business Set Aside - Total
W2sd Endist Baltimore$9.1M4
Aug 2025Fort Peck Unwatering Pump Replacement Fort Peck Dam Montana\N\Nthis Solicitation Is Being Advertised As 100% Total Small Business
Small Business Set Aside - Total
W071 Endist Omaha$1.3M3
Jul 2025Project Title: John Day Generator Water Cooling System Rehab\N\Nlocation: Sherman County, Oregon And Klickitat County, Washingtonmagnitude Of Construction: $5, 000, 000.00 To $10, 000, 000.00
Small Business Set Aside - Total
W071 Endist Portland$8.4M3
Aug 2024Tenkiller Dam Mechanical Repairs, Tenkiller Ferry Dam, Gore, Oklahoma
Small Business Set Aside - Total
W076 Endist Tulsa$3.6M3
Jun 2024Bb Depressing Air System RehabilitationW071 Endist Omaha$1.5M5
Is this your company?

Claim this profile free, and see the open contracts that fit what you win: who else bids, what the government paid last time, and what to bid.

Claim this profile freeCompete with Ams Industrial LLC →
From federal contract award records (SAM.gov), base awards over $10K since fiscal year 2024, updated daily. Values include options where reported.
ZukoBid is an independent service, not affiliated with or endorsed by any government agency. Figures come from public records and may contain errors; always check the official listing before you bid. Spotted an error about Ams Industrial LLC? Request a correction.